Pitsea Hall (CCTV LC) 13/06/2015 at 06:26 #73246 | |
Andrew G
552 posts |
Had a quick look at the manual and I can't see this mentioned. In the IECC Pitsea Hall LC is controlled by the Southend Signaller and not the Crossing Signaller. Is this the case when LC are enabled in the simulation and different people are assigned to the various Work Stations? Log in to reply |
Pitsea Hall (CCTV LC) 19/06/2015 at 16:54 #73523 | |
GeoffM
6377 posts |
I had conflicting information on that crossing, and I didn't recall the crossing from visiting or have photos of the relevant bit of desk. But I recently saw a photo of the crossing workstation and only counted 9 crossings so you must be right. I've re-allocated that crossing to the Southend workstation.
SimSig Boss Log in to reply |
Pitsea Hall (CCTV LC) 21/06/2015 at 13:09 #73570 | |
Andrew G
552 posts |
Thanks for looking into this and amending the Simulation. It probably would have been more help if I had included a link to my Picture. https://www.flickr.com/photos/llangollen_signalman/10715749166/in/album-72157637393666933/ Log in to reply |