There are several difficulty options on starting the Gloucester sim:
Beginner No trackside failures, line closures or Temporary Speed Restrictions (TSRs), although there is a small chance that trains will be delayed.
Standard Normal running, however some trains are a bit late and it is likely that trackside failures could present themselves from time to time.
Bad Weather A standard simulation but with the added problems of fog and slippery rails causing lots of slow running and delays.
Difficult Trains are quite badly disrupted. There are likely to be several trackside failures too. This is not for the faint hearted.
One of those days Just one of those days when trains are very late from all directions. Standard level of failures/TSRs.
Gremlins at work It is one of those days when lots of things are going wrong with the trackside equipment. WARNING! This is very frustrating!
Previous | Contents | Next |
---|
Last edited by GeoffM on 15/09/2016 at 03:00