Page is locked
Full ARS is provided in this simulation.
Full Automatic Code Insertion (ACI ) is also provided.
As described in the Startup options page, you have the option to run with IECC standard ARS, or an enhanced version. A comprehensive list of which routes are ARS in IECC mode can be found on the Route Notes page.
Some signals at Banbury are semaphores in the 2013 and 2015 mode.
LUL 4th rail electrification is installed throughout the LUL area. No other lines are electrified.
TRTS is only provided at Marylebone; no other locations are equipped with it.
Last edited by Steamer on 30/07/2020 at 15:33