You are here: Wiki > start > simulations > Crewe > Panels > Winsford

Locked Page is locked

Table of Contents

Crewe
Winsford Signal Box

Crewe

Winsford Signal Box

The section between Hartford Junction and Hartford CLC Junction is very short, and is further restricted by a single lead junction at either end. It is recommended that two trains longer than 320 meters are not allowed to pass on the section, but rather you hold your train back.

Flashing yellow aspect sequences are provided for routes to the Up Slow at Winsford and Acton Bridge, Down Slow at Hartford Junction (2007 - 2015 and 2016 - 2023 eras) and to the Down Liverpool (not via the DPL).


Last edited by pedroathome on 16/04/2023 at 13:58