You are here:
Wiki
> start > simulations > yorkns > timetable_notes
Page is locked
York North/South
Four timetables are provided with the simulation (more user-created timetables are likely to available in due course). These are as follows:
- York 15-10-09 (0000 start): Groundhog day timetable compatible with adjacent simulations with timetables for the same date (15th October 2009, starting at midnight). Select the "2011 and earlier" era for this timetable.
- York 15-10-09 (0445 start): As above but an 04:45am start. Select the "2011 and earlier" era for this timetable.
- York - April 2016 Ferrybridge diversions: A Saturday timetable but with Hambleton Junctions closed for engineering work, necessitating East Coast Main Line traffic to travel via Ferrybridge. Select the "2012 onwards" era for this timetable.
- York Spring 2016: A weekday timetable for 2016. Select the "2012 onwards" era for this timetable.
Each timetable has been left with the conflicts as planned by the train operating companies. Most of the day there are very few but late into the evening there are several conflicts in each of the timetables that you need to resolve for yourself - just like signallers have to do at York IECC.
York North/South Contents
Last edited by Steamer on 30/06/2019 at 17:03