You are here: Wiki > start > usertrack > areainfo > watfordjn

Table of Contents

Watford Junction
Introduction
Multiplayer and Chaining
Key Features
Difficulty Rating
Credits

Watford Junction

London Midland Region

:usertrack:areainfo:watfordjn.png

Introduction

Watford Junction controls 6 miles of the West Coast Main Line, from Bushey to just north of Kings Langley. Although most trains pass through the area with no intervention, freight trains may need to be held in King’s Langley loop, and trains may need to be switched between fast and slow lines following train delays or equipment failures. The branch to St. Albans Abbey is also included.

Watford Junction is a Payware simulation- to play beyond a short demo period requires the purchase of a license from the Product area .

Watford Junction user manual

Multiplayer and Chaining

Key Features

  • Accurate simulation of the procedure used to get trains on and off the St. Albans branch.
  • Small area
  • Mix of inter-city passenger, local passenger and freight.

Difficulty Rating

  • Passenger- Low
  • Freight- Low
  • Layout Complexity- Low
  • Overall- Low

Credits

Many thanks to PP (Guts) for his help in ensuring the simulation is as realistic as possible. Thanks also to Peter Bennet, Stephen Fulcher, and the ICT group for testing and timetabling.

-Geoff Mayo, simulation developer

Available Simulations

Last edited by Steamer on 26/04/2017 at 19:20