You are here: Home > Files > User-contributed > Timetables > Oxted > File Details - Oxted 16th February 2020

File Details - Oxted 16th February 2020

Title
Oxted 16th February 2020
Description

This timetable requires:
* East Grinstead possession scenario;
* 2013 era.

On the 16th of February 2020, heavy rain resulted in a landslip near East Grinstead, blocking the line between there and Lingfield. Services ran as follows:

2tph London Bridge - Lingfield
1tph Oxted - Uckfield

* Earlier in the morning, high winds caused cancellations of all Uckfield trains until around midday and Lingfield trains being turned back early at Oxted.
* Lingfield ground frame is manned for the day so that trains may be turned back here.
* Most trains operating were on VSTP so platform conflicts and delays are inevitable.

V1.1 - Trains now stop correctly at Lingfield.

Category
User-contributed > Timetables > Oxted
Published
Status
Approved
Submitted
23/02/2020 at 08:32
Submitted By
OJH
Number of Downloads
1,146
Version
1.1.0
File Size
12.2 KiB
File Name
Oxted 16th February 2020.WTT

Download | Edit | Back to List