You are here: Home > Files > User-contributed > Timetables > Manchester Piccadilly > File Details - Manchester Piccadilly - February 2020
An updated version of my February 2020 timetable for Piccadilly, which thanks to the SimSig team can now make full use of the Ordsall Chord and associated layout changes, as well as an electrified Bolton line with an additional platform. As with the real thing, it works perfectly well on paper/in easy mode; but rapidly collapses when delays and failures present themselves. This TT must be run in the 2019 mode to take advantage of the latest layout.
Download | Edit | Back to List