(UTC times)
You are here: Home > Files > User-contributed > Timetables > Doncaster (South) > File Details - Doncaster PSB (South) December 21 - May 22
Timetable based on 20th December 2021. LNER and Northern services were based off the LTP diagrams, found on whatdotheyknow. EMR services were based off RealTimeTrains, as they have now joined Know Your Train.
A new operator has arrived on the East Coast Mainline, of course being Lumo or what would have been "First East Coast Trains", operating a few of the Edinburgh - London and vice versa - the high numbered 1Sxx and 1Exxs - operated with 803/0s.
Download | Edit | Back to List