(UTC times)
You are here: Home > Files > User-contributed > Timetables > London King's Cross > File Details - Kings Cross April 2003
This timetable is set during Spring 2003 and features GNER leasing the North of London Eurostars, Hull Trains introducing their new services including ECS moves between London Kings Cross and London Liverpool Street, WAGN ECS's between Hornsey EMUD and the West Anglia Mainline as well as the usual mix of freight, GNERs and WAGNs.
This includes some missing postal services that have now been added to the timetable as well as some timing corrections for trains originating or entering at Royston.
Please note that this timetable is not yet available to chain with any other simulation at this time.
Download | Edit | Back to List