(UTC times)
You are here: Home > Files > User-contributed > Timetables > London King's Cross > File Details - Fictional Kings Cross January 2005 Bigglewade Blockade
Due to engineering works being carried out at Biggleswade, an amended timetable was in operation during Saturdays in the month of January 2005 with GNER services being diverted via Cambridge and WAGN Peterborough services being diverted to Letchworth to connect with a rail replacement service.
Hull Trains operated a Cambridge to Hull service so are not represented here.
Download | Edit | Back to List