You are here: Home > Files > User-contributed > Timetables > London King's Cross > File Details - Actual Kings Cross January 2005 Bigglewade Blockade

File Details - Actual Kings Cross January 2005 Bigglewade Blockade

Title
Actual Kings Cross January 2005 Bigglewade Blockade
Description

Due to engineering works being carried out at Biggleswade, an amended timetable was in operation during Saturdays in the month of January 2005 with GNER services only operating a shuttle between Kings Cross and Stevenage with a Rail Replacement Bus service operating to Peterborough and WAGN Peterborough services being diverted to Letchworth to connect with a rail replacement service.

Hull Trains operated a Cambridge to Hull service so are not represented here.

Category
User-contributed > Timetables > London King's Cross
Published
Status
Approved
Submitted
07/08/2024 at 04:18
Submitted By
ajax103
Number of Downloads
301
Version
1.1
File Size
51.2 KiB
File Name
Actual Kings Cross January 2005 Bigglewade Blockade.WTT

Download | Edit | Back to List