(UTC times)
You are here: Home > Files > User-contributed > Timetables > Wembley Suburban > File Details - Summer 2012 Olympic Friday (Chainable)
<p>Update to the original Summer 2012 Olympic timetable (aka <em>Friday August 3 2012</em> to allow chaining to the Wembley Main Line version of the same timetable. The timetable was extended backwards to midnight. Necessary seed trains and onward workings have been added, including Bakerloo line tubes (even though these do not cross the chain boundary).</p>
Download | Edit | Back to List