You are here: Home > Files > User-contributed > Timetables > Tyneside > File Details - Tyneside August 2016 + Extras

File Details - Tyneside August 2016 + Extras

Title
Tyneside August 2016 + Extras
Description

A typical day during the current timetable in the North East.
Despite the decimation of coal traffic I have left the schedules in
Note Cannot route / schedule to Tyne Dock GBRF from the Sunderland direction. Bolden East Jn is not listed as a location but is in Train Planning Rules. GBRF services do not RR at Pelaw and go right round the curve at Bolden
Enjoy

Category
User-contributed > Timetables > Tyneside
Published
Status
Approved
Submitted
09/10/2016 at 00:02
Submitted By
Chrisrail
Number of Downloads
1,047
Version
0.0.0
File Size
123.6 KiB
File Name
Tyneside IECC AUGUST 2016 + EXTRAS v1.5.WTT

Download | Edit | Back to List