Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

East London Line

You are here: Home > Forum > Wishlist > Simulation wish list > East London Line

Page 4 of 4

East London Line 07/06/2010 at 10:25 #9513
tgb
Avatar
19 posts
Vitesse,
4 an hour to W.Croydon + 4 an hour to Crystal Palace is a bit of overkill don't you think. I don't know how they are going to resolve this, (dabbadaz or any other 3 bridges / Lon Bridge signallers - are you having probs with this!) Despatch at Norwood plat 1 has always been a little slow!!. Do they have to give you 'the bat' by the cab as they have to with us on 377's ? always fun when there is only one guy on the platform and we have an 8 car! has to give the tip and then walk all the way back to the RA button !! Are you guys not going to be running 8 cars ?

Tony

Log in to reply
East London Line 07/06/2010 at 12:14 #9514
Vitesse
Avatar
31 posts
Deleted
Log in to reply
East London Line 08/06/2010 at 09:06 #9529
kbarber
Avatar
1743 posts
Vitesse said:
Very true, theres currently 8 trains per hour each way between NXG and sydenham,
<snip>
Just a case of too many trains and not enough track I think :)

8 tph too many? What about Liverpool Street when it used to be busy (say 1920): 24tph on the Suburban lines to Bethnal Green (plus what they turned out on the Main & Local lines, another 32tph in all). Can electric trains & power signalling really not cope with 1/3 the traffic of steam kettles (N7 was the standard class) hauling 10 coaches up the 1-in-70 under mechanical signalling with Sykes L&B?

Progress???? !!!!!

Log in to reply
East London Line 08/06/2010 at 09:22 #9531
GeoffM
Avatar
6376 posts
Online
kbarber said:
Vitesse said:
Very true, theres currently 8 trains per hour each way between NXG and sydenham,
<snip>
Just a case of too many trains and not enough track I think :)

8 tph too many? What about Liverpool Street when it used to be busy (say 1920): 24tph on the Suburban lines to Bethnal Green (plus what they turned out on the Main & Local lines, another 32tph in all). Can electric trains & power signalling really not cope with 1/3 the traffic of steam kettles (N7 was the standard class) hauling 10 coaches up the 1-in-70 under mechanical signalling with Sykes L&B?

Progress???? !!!!!
I think Vitesse was referring to 8 additional trains, not 8 in total! FWIW the theoretical throughput between Liverpool Street and Bethnal Green these days is 30tph (2 minute headway) per line, according to the 2010 Rules of the Plan. Parts of the ELL are 1.5 minute headways!

SimSig Boss
Log in to reply
East London Line 08/06/2010 at 10:24 #9532
Vitesse
Avatar
31 posts
Deleted
Log in to reply