Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Kings Cross summer 2019 timetable uploaded

You are here: Home > Forum > Simulations > Timetables > King's Cross > Kings Cross summer 2019 timetable uploaded

Page 3 of 3

Kings Cross summer 2019 timetable uploaded 26/04/2019 at 22:50 #117863
pedroathome
Avatar
915 posts
Online
Peter Bennet in post 117862 said:
baitboy2004 in post 117859 said:
But could NR upgrade the power supply on the OHLE north of Ely for the class 700s to allow for operation to Kings Lynn to happen?
Yes.

Peter
In theory, they could electrify anywhere, even a branch line on its own should they so wish. The catch is, is it financially worthwhile doing (Cost - Benefit ratio)

Log in to reply
Kings Cross summer 2019 timetable uploaded 15/05/2019 at 06:37 #118312
lqsignal
Avatar
16 posts
Haven't had a chance to download and try it yet, but just curious if it includes the class 800 test trains running almost daily between Doncaster Carr IEP depot and Leeds to KX?
Log in to reply
Kings Cross summer 2019 timetable uploaded 15/05/2019 at 06:55 #118313
lqsignal
Avatar
16 posts
baitboy2004 in post 117859 said:
But could NR upgrade the power supply on the OHLE north of Ely for the class 700s to allow for operation to Kings Lynn to happen?
Anything can be done with enough money. Aside from the OHLE there is the problem of short platforms at Littleport and Watlington. Do the 700s have Selective Door Operation like the entire Turbostar, Electrostar and Desiro families?

Log in to reply
Kings Cross summer 2019 timetable uploaded 15/05/2019 at 10:05 #118317
Peter Bennet
Avatar
5402 posts
Online
lqsignal in post 118313 said:
Do the 700s have Selective Door Operation like the entire Turbostar, Electrostar and Desiro families?
I believe so. For several months after introduction 12-car 700s, entering platform 2 at Finsbury Park, played an erroneous announcement that due to a short platform the rear doors would not open.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
Kings Cross summer 2019 timetable uploaded 16/05/2019 at 20:11 #118334
Red For Danger
Avatar
172 posts
Peter Bennet in post 118317 said:
lqsignal in post 118313 said:
Do the 700s have Selective Door Operation like the entire Turbostar, Electrostar and Desiro families?
I believe so. For several months after introduction 12-car 700s, entering platform 2 at Finsbury Park, played an erroneous announcement that due to a short platform the rear doors would not open.

Peter
Yes - the 700's have selective door opening. I was on a 12 coach 701 that stopped at Knebworth to pick up passengers from a stranded 387 that was halted on the fast line a couple of months ago. Knebworth's platforms will only accommodate 8 car trains and the doors in my carriage towards the rear had 'door not in use' illuminated' by the operating button to prevent you trying to open it as they were not at the platform face.

Log in to reply
Kings Cross summer 2019 timetable uploaded 29/05/2019 at 12:35 #118529
M1ch4el
Avatar
21 posts
I see on Network Rails WTT CJ01 May-Dec 2019 timetable includes 9U stopping services from Cambridge through to Maidstone East etc. Is this planned for later in the year? If so it would be a good addition to the current tt.

Michael

MJDM
Log in to reply
Kings Cross summer 2019 timetable uploaded 29/05/2019 at 20:59 #118539
DavidSplett
Avatar
142 posts
M1ch4el in post 118529 said:
I see on Network Rails WTT CJ01 May-Dec 2019 timetable includes 9U stopping services from Cambridge through to Maidstone East etc. Is this planned for later in the year? If so it would be a good addition to the current tt.

Michael
I think Cambridge / Maidstone is pencilled in for May 2020. I’m tending to write up-to-date KX timetables for Simsig, and no doubt this will happen nearer the time.

Log in to reply
The following user said thank you: M1ch4el
Kings Cross summer 2019 timetable uploaded 30/05/2019 at 05:14 #118546
lqsignal
Avatar
16 posts
M1ch4el in post 118529 said:
I see on Network Rails WTT CJ01 May-Dec 2019 timetable includes 9U stopping services from Cambridge through to Maidstone East etc. Is this planned for later in the year? If so it would be a good addition to the current tt.
9U will mostly replace existing 2C services to/from KX, e.g. 9U35 replaces 2C35.

Log in to reply