Page 1 of 1
Tillgate Sidings Level Crossing. 14/08/2022 at 06:28 #147568 | |
Giantray
347 posts |
There is a barrier Level Crossing in Tilgate Sidings that the sim does not show. Does anyone know how the level crossing is controlled? Who/What operates the crossing?
Professionalism mean nothing around a bunch of Amateur wannabees! Log in to reply |
Tillgate Sidings Level Crossing. 14/08/2022 at 18:17 #147574 | |
madaboutrains
316 posts |
This level crossing is controlled by the depot Panel at Three Bridge depot itself https://www.lococarriage.org.uk/Three%20Bridges%20Depot%20Panel.jpg You can see the controls in this picture. RIP Feltham Panel 1 Last edited: 14/08/2022 at 18:19 by madaboutrains Reason: None given Log in to reply |
Tillgate Sidings Level Crossing. 16/08/2022 at 03:38 #147585 | |
Giantray
347 posts |
Thank you. I work next door to the Siemens depot and never knew this panel existed. Interesting that Siemens did not go for a softer option and use their West Cad system as they own the depot. Looking at the archaic magnetic stickers to indicate trains. If they indicate the unit numbers, as they appear to do, there must be a board somewhere with a magnetic stciker for every Class 700 unit number on (115 units). A workstation for this would have taken up much less space too.
Professionalism mean nothing around a bunch of Amateur wannabees! Log in to reply |