You are here: Home > Files > User-contributed > Timetables > North Wales Coast > File Details - N. Wales Coast Spring 2022
The TT data is based on 17th-19th March 2022. Stock data from "a small enthusiast website" has been added where known.
This version has been designed to chain with Spring 2022 timetable for Chester v1.3 or higher.
Some 'special' and STP services may have conflicting platform allocations, this is prototypical.
On Saturday, the Llandudno shuttle runs as a single (PRM) dogbox, this has been reallocated to platform 3 to avoid the driver querying the state of the locomotive shunt ground frames.
Version History
============
v1.0 20220525 - Initial Release
v1.1 202205xx - Typos corrected (version not released)
v1.2 20220612 - 3D/3K ECS test trains changed to Cl. 197; terminal dwell times amended.
v1.3 20220616 - Tal-Y-Cafn request stop option removed in Down direction.
v1.4 20221230 - Corrections to some Speed Classes and dwell times.
Download | Edit | Back to List