Page 1 of 1
Signals and Points Missing on the Askern Branch (1981-1997) Yesterday at 23:56 #160850 | |
0D07
![]() 98 posts |
Afternoon. Whilst researching for a Timetable set in the early to mid 1990s. That would see Askern Colliery in use I saw that some of the signalling is missing that is slotted/controlled by Norton G.B. The connections into the "Coalite" Plant is not shown on the simulation and nor is the connection towards the rapid loading "Bunker" Line, the "Running" Line towards D897 is the only part shown. I have looked at my drawings for the Doncaster PSB Scheme and the original panel drawings do just show a single line towards D897. As the picture shows 3 extra signals and set of points and a G.F. Release 2542 are all shown on Norton's Panel https://photos.signalling.org/picture?/21821/category/2388-norton Regards, Zero Delta Zero Seven Log in to reply |
Signals and Points Missing on the Askern Branch (1981-1997) Today at 03:42 #160851 | |
GeoffM
![]() 6415 posts |
Thanks, but as you say, the Doncaster panels don't show this. I don't see much benefit in altering the layout there, sorry.
SimSig Boss Log in to reply |