You are here: Home > Files > User-contributed > Timetables > Derby > File Details - Derby Nov 2022
Please report any issues on the forum. Thanks!
SIM NOTES
==========
The TT data is based on 1st November 2022. Stock data from "a small enthusiast website" has been added where known. Freight allocations found with the help of user reports at ltsv.com and the WTT's (CY03 and CY09B)
This version chains with Aston and Saltley.
Some tweaks have been made to support the sim version that deviate from the WTT data:
- Trains from Kingsbury Frame will enter from Kingsbury Jn as there's no entry point defined
- Trains to/from East Mids Gateway will use Sheet Stores Jn
- Trains to/from Derby RTC and Litchurch Lane will use GL instead of platform lines
- Platform 5 is now a through road, so platform adjustments have been made to accommodate sim
- Terminating trains on platform 4 (Matlock Shuttle) have been moved to 3B which is permissive in the sim
Operational Notes
==============
- Make sure you call Derby RTC in good time, if they request the P-Way Siding you will need to re-route trains via platform lines!
- Check the simplifier and use 504/473 for trains if stopping on the Curve would block passage to/from Chaddesden Sidings!
- Line speeds from Tamworth - Wichnor and from Ambergate - Clay Cross have been raised after the era of the sim, so a couple of minutes' lateness can be expected for some services.
- A couple of unplanned terminations occur at Derby, the TT has NOT be re-platformed to avoid conflict for these!
Version History
============
v0.4 - 20221128 - Initial Release
v0.5 - 20230820 - Chaining with Aston and Saltley. Minor correction to Cl. 220 profiles.
v0.6 - 20240703 - Minor corrections to stock types.
Download | Edit | Back to List