(UTC times)
You are here: Home > Files > User-contributed > Timetables > Royston > File Details - Royston Spring 2003
Royston Spring 2003
This timetable is set during Spring 2003 and features GNER leasing the North of London Eurostars, Hull Trains introducing their new services including ECS moves between London Kings Cross and London Liverpool Street, WAGN ECS's between Hornsey EMUD and the West Anglia Mainline as well as the usual mix of freight, GNERs and WAGNs.
This includes some timing corrections for trains originating or entering at Royston.
This timetable currently only chains with Kings Cross.
Download | Edit | Back to List