Upcoming Games

No games to display

Full list
Add a game

Upcoming Events

No events to display

Who's Online

Plymouth simulation - Trains from Tamar Valley

You are here: Home > Forum > Simulations > Released > Plymouth > Plymouth simulation - Trains from Tamar Valley

Page 1 of 1

Plymouth simulation - Trains from Tamar Valley 27/08/2017 at 22:05 #101287
intallonabile
Avatar
24 posts
Is there some problems from trains coming from Tamar Valley ?
no trains are allounced from this entrance point even if they are scheduled on timetable and also on simplifier.
Is there something wrong in my behaviour ?

thanks for the reply
Diego from NW Italy

Log in to reply
Plymouth simulation - Trains from Tamar Valley 27/08/2017 at 22:14 #101290
intallonabile
Avatar
24 posts
Sorry if my question is not in the correct section Diego
Log in to reply
Plymouth simulation - Trains from Tamar Valley 27/08/2017 at 23:18 #101296
Steamer
Avatar
3997 posts
The Tamar Valley line isn't an exit point. The line to Gunnislake, which is just a long single line, is fully simulated. To get a train to leave the branch, you first have to send a train onto the branch.

Trains should be timetabled from Plymouth (or wherever you choose) to either Gunnislake or Bere Alston; they can then form a new service departing from that location. See the supplied timetables for examples.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
Plymouth simulation - Trains from Tamar Valley 28/08/2017 at 07:25 #101297
intallonabile
Avatar
24 posts
Thanks for the reply and sorry for my bad english.
According to your reply at my question if i have well comprise i must send a train to Gunnislake branch with the exact train identification number so the simulation can manage the train to arrive at Gunnislake and to return in Plymouth according to the timetable that i have choose
But if the timetable consider that trains from Gunnislake depart toward the same direction to have this type of traffic i must start simulation with the first train in the day (sorting from laira depo i think ?) In other case i will never have train from or towards tamar line valley

good week

Diego

Log in to reply
Plymouth simulation - Trains from Tamar Valley 28/08/2017 at 16:59 #101301
DaveHarries
Avatar
1287 posts
Diego,

If you look at the current schedule for Gunnislake station today (Monday) for example - http://www.realtimetrains.co.uk/search/advanced/GSL/2017/08/28/0000-2359?stp=WVS&show=all&order=wtt - the idea of one train on before you get one train off the branch is correct. This is because there are no places along the line where trains can be stored overnight: the nearest depot which serves this line is at Laira which is in the city of Plymouth. Many years ago trains continued beyond Gunnislake to a small town called Callington but this finished in November 1966. A separate route, between Bere Alston and Tavistock, closed in 1968 although reopening has been suggested. The location of Tavistock does not feature on the Plymouth map.

The only location on the Gunnislake railway which does not require a train train to arrive before one can leave are the Ernesettle MOD (Navy) sidings: despite Ernesettle MOD not being on the map that location is listed as an entry point, and can also be used as an arrival point, for trains. However only freight trains use Ernesettle: there is no passenger station.

I hope this clarifies things a little.

Greetings from England,
Dave

Last edited: 28/08/2017 at 17:00 by DaveHarries
Reason: None given

Log in to reply
Plymouth simulation - Trains from Tamar Valley 28/08/2017 at 19:21 #101305
intallonabile
Avatar
24 posts
thanks everybody for explication about my original question.

Good evening from NW Italy (With 37 celsius, and weather as in sahara Desert). This night it will be a nightmare to sleep

Log in to reply