Page 1 of 1
KX / WH Tunnel link 07/04/2018 at 18:10 #107363 | |
DaveHarries
1285 posts |
Evening all, With the impending advent of services between Cambridge and Brighton I wonder what the odds would be that the layouts might, at some point in the future, be revised for the Kings Cross and West Hampstead simulations to facilitate such running? This example, from RTT, gives the route as Finsbury Park - Belle Isle - St. Pancras: although there is an exit from Kings Cross sim onto St. Pancras (I guess that link is now double-track?) there is nothing on WH. http://www.realtimetrains.co.uk/train/W64024/2018/05/21/advanced TGN, for their part, say that "the times of every train will change" from 20th May. Dave Log in to reply |
KX / WH Tunnel link 07/04/2018 at 19:40 #107364 | |
Jan
906 posts |
DaveHarries in post 107363 said:although there is an exit from Kings Cross sim onto St. Pancras (I guess that link is now double-track?) there is nothing on WH. That's the connection off the North London Incline, which only leads into the International platforms at St. Pancras - the Canal Tunnels link for Thameslink is a completely separate affair a little further up the line. Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick. Log in to reply |
KX / WH Tunnel link 07/04/2018 at 20:37 #107366 | |
Peter Bennet
5402 posts |
Trains have been running through since 26 Feb. Timetable from May is here https://www.railplan2020.com/timetables Peter I identify as half man half biscuit - crumbs! Log in to reply |
KX / WH Tunnel link 07/04/2018 at 22:27 #107369 | |
bugsy
1766 posts |
Jan in post 107364 said:DaveHarries in post 107363 said:I wasn't aware of a new connection until I came across this article:although there is an exit from Kings Cross sim onto St. Pancras (I guess that link is now double-track?) there is nothing on WH. http://www.thameslinkprogramme.co.uk/canal-tunnels-open-new-north-south-london-connections-first-time Everything that you make will be useful - providing it's made of chocolate. Log in to reply |
KX / WH Tunnel link 09/04/2018 at 22:14 #107433 | |
lpeters
160 posts |
I was just about to ask about this but happy to see it has been asked already. I'm hopeful of seeing this introduced but appreciate there was previously a conflict of interest around this sim due to the Cross being an IECC but not sure if the conflict is still relevant or not as it isn't in the wiki page any more? Log in to reply |
KX / WH Tunnel link 10/04/2018 at 00:10 #107434 | |
DaveHarries
1285 posts |
lpeters in post 107433 said:[...]due to the Cross being an IECC Some of Cross is an IECC (the Hertford Loop) but I am pretty sure that the KX station part of the panel remains non-IECC. I will see if I can get hold of a photo to double-check and will post it here if I can get permission to do so. Dave Log in to reply |
KX / WH Tunnel link 10/04/2018 at 00:33 #107435 | |
GeoffM
6376 posts |
King's Cross PSB is an NX panel. The Hertford Loop part is Westcad, not IECC. Neither have ever been subject to conflicts of interest. http://photos.signalling.org/index?/category/2137-king_s_cross SimSig Boss Log in to reply |
KX / WH Tunnel link 13/04/2018 at 20:42 #107504 | |
lpeters
160 posts |
I happily stand corrected
Log in to reply |