Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Motherwell Groundhog day (15-10-09) Timetable

You are here: Home > Forum > Simulations > Timetables > Motherwell > Motherwell Groundhog day (15-10-09) Timetable

Page 1 of 3

Motherwell Groundhog day (15-10-09) Timetable 14/05/2018 at 15:52 #107940
Noisynoel
Avatar
989 posts
An updated version of the Motherwell groundhog day timetable is available in the Downloads area under timetables/motherwell.

This has been extensively tested but there may still be some issues slipping through the cracks so please report them in this thread.

Enjoy
Noel

Noisynoel
Log in to reply
The following users said thank you: HST125Scorton, Hap, BarryM
Motherwell Groundhog day (15-10-09) Timetable 14/05/2018 at 20:04 #107947
Hap
Avatar
1039 posts
Online
Cheeerrs!!!!!
How to report an issue: www.SimSig.co.uk/Wiki/Show?page=usertrack:reportanissue
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 28/05/2018 at 11:51 #108306
Andrew G
Avatar
552 posts
OH26 (L73202) and 6H26 (L73202) don't work.

OH26 has a final timing point of Mossend (DR2) so stops on DR2 waiting to join 6H26.

6H26 has a rule which states that it must appear 20 minutes after 0H26 leaves the area.

0H26 doesn't leave the area so 6H26 never enters.

When 6H26 does enter it is expecting to find 0H26 waiting to join it - so this needs to be taken account of when correcting WTT.

Last edited: 28/05/2018 at 12:36 by Andrew G
Reason: Additional line added once 6H26 entered.

Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 28/05/2018 at 14:46 #108311
Andrew G
Avatar
552 posts
Another issue I have encountered several times, which require manual intervention, are reversals of long trains at MB298.

Even with MB329 Off before the movement starts they are not proceeding far enough to be in rear of MB298.

I am interested to hear whether your Testers were able to deal with these movements without manual intervention.

A save is attached with 8N36 waiting to shunt via MB298.

Post has attachments. Log in to view them.
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 28/05/2018 at 15:04 #108312
MarkC
Avatar
1105 posts
Andrew G in post 108311 said:
Another issue I have encountered several times, which require manual intervention, are reversals of long trains at MB298.

Even with MB329 Off before the movement starts they are not proceeding far enough to be in rear of MB298.

I am interested to hear whether your Testers were able to deal with these movements without manual intervention.

A save is attached with 8N36 waiting to shunt via MB298.
In these cases manual intervention will always be required as the lenght of track between signals MB298 and MB329 is not long enough to fit a train of that length and ARS would only know to set the route upto MB329 for a reversal at that location so it will therefore never set a route beyond MB329 to enable the train to get completely behind signal MB298, so manual intervention would always be required in these situations

Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 28/05/2018 at 15:08 #108313
Andrew G
Avatar
552 posts
MarkC in post 108312 said:
Andrew G in post 108311 said:
Another issue I have encountered several times, which require manual intervention, are reversals of long trains at MB298.

Even with MB329 Off before the movement starts they are not proceeding far enough to be in rear of MB298.

I am interested to hear whether your Testers were able to deal with these movements without manual intervention.

A save is attached with 8N36 waiting to shunt via MB298.
In these cases manual intervention will always be required as the lenght of track between signals MB298 and MB329 is not long enough to fit a train of that length and ARS would only know to set the route upto MB329 for a reversal at that location so it will therefore never set a route beyond MB329 to enable the train to get completely behind signal MB298, so manual intervention would always be required in these situations
The session isn't being run with ARS enabled and there are other locations within the simulation where a long train requires to have an additional signal to trigger the timing point - Carstairs and Long Sleepers comes to mind. At the end of the day it might be a simulation rather than WTT issue - but point accepted re ARS if it was enabled.

Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 28/05/2018 at 15:32 #108314
Noisynoel
Avatar
989 posts
Does the timetable show N for near end stop? On first test they stopped wrong, but after the additional of the near End Stop they worked fine
Noisynoel
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 28/05/2018 at 15:50 #108315
MarkC
Avatar
1105 posts
I will admit that I thought it was ARS that was the cause given that in most cases this situation is normally caused by ARS, however it seems that the train does stop with the trailing end over the points.

Noel The Timetable for said train Does have Near end listed and it still behaves a such. A quick test showed that if the train is to fit fully a default stopping position of far end would be required

Last edited: 28/05/2018 at 16:05 by MarkC
Reason: Changed text after further testing

Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 29/05/2018 at 10:03 #108320
postal
Avatar
5265 posts
Online
MarkC in post 108315 said:
I will admit that I thought it was ARS that was the cause given that in most cases this situation is normally caused by ARS, however it seems that the train does stop with the trailing end over the points.

Noel The Timetable for said train Does have Near end listed and it still behaves a such. A quick test showed that if the train is to fit fully a default stopping position of far end would be required
I think you can force it past the signal with a stopping position of FX -nnn metres if necessary.

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 29/05/2018 at 19:24 #108332
Stephen Fulcher
Avatar
2084 posts
Certainly works on Plymouth, normal stopping position at Mount Gould isn't clear of the points if you don't give the shunt upto Friary, so you order an NX and the train phones up for the signal if you forget rather than reversing short.
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 29/05/2018 at 19:38 #108333
Peter Bennet
Avatar
5402 posts
The adjustment factors are in the manual.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 01/06/2018 at 23:10 #108408
Soton_Speed
Avatar
285 posts
In tonight's Motherwell - Carlisle chain it was found that the Motherwell TTs are missing a train -
4S80 04:52 Walton Old Jn Yard - Mossend Down Yard (DBS Cl66 + 20 HTA, 378m)
Gretna Jnc 07/25
Kirkpatrick S863 07/29
Lockerbie 07/40

TIA.

In Zone 6, no one can hear you scream...
Last edited: 01/06/2018 at 23:29 by Soton_Speed
Reason: None given

Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 04/06/2018 at 22:32 #108453
HST125Scorton
Avatar
1192 posts
Online
Missing rules on a handful of freight while running the timetable.
Should these be alternatives? as they both runs but both timetables only show the one 6M49 at Mossend.
6M49 Millerhill to Carlisle N.Y.
6M49 Mossend Yard to Carlisle N.Y.

Aaron (AJRO) | Timetable Writer
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 05/06/2018 at 07:02 #108455
Noisynoel
Avatar
989 posts
4S80 wasn't booked to run on 15-10-09 hence it is not in the Motherwell timetable
Noisynoel
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 05/06/2018 at 07:03 #108456
Noisynoel
Avatar
989 posts
Well spotted, I'll add the rule in
Noisynoel
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 30/06/2018 at 16:33 #109981
HST125Scorton
Avatar
1192 posts
Online
I'm upto 20:30 in this timetable, I'm unsure of location Mossend Path UC Location DAR?? which is used by a couple of trains at Mossend for going into Down Arrival 1. 6M22 and 6M50 Flask return services no alternative rules for them same with going out services. There are still a number of rules that don't seem to work either. Shunts to MB298 for reversal into Mossend DA1 or 2 trains with N near end applied don't work as should instead sit there with half the train on the junction I'm thinking all these reversals should be made at MB300 reverse to save any issues. Anyway final part 2030 to end of timetable will post if anything is a miss.
Aaron (AJRO) | Timetable Writer
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 30/06/2018 at 17:42 #109982
HST125Scorton
Avatar
1192 posts
Online
Noisynoel in post 108455 said:
4S80 wasn't booked to run on 15-10-09 hence it is not in the Motherwell timetable
Regardless if it did or didn't ran, the train should be there as a run as required and then run if it crosses in from Carlisle if chained. Or run when required if Motherwell ran solo.

4S80 04:52 Walton Old Jn Yard - Mossend Down Yard (DBS Cl66 + 20 HTA, 378m)

Gretna Jnc 0725
Kirkpatrick S863 0729
Lockerbie 0741
Beattock 0753
Beattock Summit 0808H
Abington 0815H
Carstairs South Jn 0828
Carstairs 0828H
Lanark Jn 0831H - Allowence - Pathing 2
Law Jn 0840H - Allowence - Pathing 6H
Holytown Jn 0853
Mossend East Jn 0854
Mossend Down Yard 0900 ARR DA4

Aaron (AJRO) | Timetable Writer
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 30/06/2018 at 21:59 #109993
Noisynoel
Avatar
989 posts
What I'm saying is it really should be removed from the Carlisle timetable as it didn't run, not put into the Motherwell timetable
Noisynoel
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 30/06/2018 at 22:03 #109994
HST125Scorton
Avatar
1192 posts
Online
Never thought of that one, I'll take back my 4S80 comment.
Anyway where is Mossend UC DAR? Scratching my brains on this.. I bet its staring in my face somewhere

Aaron (AJRO) | Timetable Writer
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 02/07/2018 at 09:19 #110008
Hap
Avatar
1039 posts
Online
HST125Scorton in post 109994 said:
Never thought of that one, I'll take back my 4S80 comment.
Anyway where is Mossend UC DAR? Scratching my brains on this.. I bet its staring in my face somewhere
I stand by my original thought and say DAR is either one of the Down Arrivals.

Craig

How to report an issue: www.SimSig.co.uk/Wiki/Show?page=usertrack:reportanissue
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 02/07/2018 at 14:19 #110015
tjtbcork
Avatar
75 posts
Online
HST125Scorton in post 109994 said:
Never thought of that one, I'll take back my 4S80 comment.
Anyway where is Mossend UC DAR? Scratching my brains on this.. I bet its staring in my face somewhere
It's Mossend North Junction from MB290 Up Coatbridge (UC)
to MB298 Down Arrivals (DAR).

Tim.

Log in to reply
The following user said thank you: HST125Scorton
Motherwell Groundhog day (15-10-09) Timetable 17/09/2018 at 12:13 #112195
Andrew G
Avatar
552 posts
A friend has asked if I might consider hosting a Motherwell/Carlisle chain.

At the present time the 2009 WTT is the only option.

Before I make local changes to the Motherwell WTT to address some of the issues raised I was wondering if an updated version was in the pipeline?

Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 17/09/2018 at 12:51 #112196
Noisynoel
Avatar
989 posts
Sorry, no updated one as yet as busy building & testing sims
Noisynoel
Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 02/10/2018 at 21:06 #112432
Andrew G
Avatar
552 posts
Either 6M31 (H73388) is too long at 398 metres for Ravenstruther HS or the HS is too short.

Trains comes out of Ravenstruther and stops at Buffer Stops, and foul of points, in effect not reaching the reversing point.

Log in to reply
Motherwell Groundhog day (15-10-09) Timetable 02/10/2018 at 21:34 #112434
HST125Scorton
Avatar
1192 posts
Online
Andrew G in post 112432 said:
Either 6M31 (H73388) is too long at 398 metres for Ravenstruther HS or the HS is too short.

Trains comes out of Ravenstruther and stops at Buffer Stops, and foul of points, in effect not reaching the reversing point.
I shorten the train by 1 wagon. 378m works perfectly. Although I'm "sure" trains upto 400m fit in Ravenstruther HS. As I sure in quotations as I could be wrong..

Aaron (AJRO) | Timetable Writer
Log in to reply