Kings Cross 1994 Winter Sunday 18/09/2018 at 13:11 #112209
lqsignal
Avatar
16 posts
I have uploaded a 1994 winter Sunday timetable with Welwyn Viaduct closed for engineering works from 0600 to 1700, so everything has to go via Hertford North. There seems to be a lot of slack in the timings for the diverted trains and I suspect they may not have run at line speed on the loop line. The morning and and early afternoon may seem a bit routine and mundane but things start to get exciting in the late afternoon when normal running resumes. Appreciate any feedback.
Log in to reply
Kings Cross 1994 Winter Sunday 18/09/2018 at 16:51 #112212
GeoffM
Avatar
6376 posts
Online
lqsignal in post 112209 said:
There seems to be a lot of slack in the timings for the diverted trains and I suspect they may not have run at line speed on the loop line.
There is usually a fair bit of slack for engineering work generally. Add to that the overheads can only deal with a certain number of trains on the Hertford Loop at a time (6? Might depend on train type) and a few more minutes might have been added to allow for holding something back until another belatedly clears the section.