19-05-19 Timetable Feedback/Testing 20/05/2019 at 09:58 #118400
Metro58
Avatar
2 posts
Hi All,

I've spent a bit of time putting together a timetable for current services through Manchester Victoria based on RTT on the 19th of this month. I've tested it until about 0940 sim time and there were only a few bugs with platform allocation (thanks to Northern and their random platform generator!). I've attached the timetable encase anyone would like to use it or even better offer some feedback on and bugs/issues found.

To add the full timetable, I've had to route any Ordsall Chord trains down Chat Moss 'pretending' the junction is further down to simplify this issue.

Known issues/quirks:
- An ECS movement from Ashburys to Brewers Junction needs a timetable rework
- No freight included
- Most ECS off Newton Heath via Victoria included but none that do not route via Victoria
- Quite a bit of short forming
- No 142s; all Northern traction is 150 (2/4) or 156 (2/4)
- Be wary of 5N10 which divided to form 5N11 and 5N13 in the Turnback sidings for 2 Peak Lime Street departures

Post has attachments. Log in to view them.
Log in to reply
19-05-19 Timetable Feedback/Testing 21/05/2019 at 14:35 #118420
Metro58
Avatar
2 posts
Some minor adjustments have been made to trains to correct some issues. Weirdly there was an issue with EMUs on down Salford slow into P4, so 319s have been set as bi-modals to allow for use.

There are still some minor platform use issues, the only one really to keep an eye out for is:
- Leeds - Man Vic - Leeds service using P4: Need to reallocated TPE services to P3

Post has attachments. Log in to view them.
Last edited: 21/05/2019 at 14:41 by Metro58
Reason: None given

Log in to reply
19-05-19 Timetable Feedback/Testing 21/05/2019 at 15:08 #118421
pedroathome
Avatar
916 posts
Metro58 in post 118420 said:
Some minor adjustments have been made to trains to correct some issues. Weirdly there was an issue with EMUs on down Salford slow into P4, so 319s have been set as bi-modals to allow for use.
I've just seen this and fixed and will be available when I next update the sim. There is a single track not electrified which should be.

Log in to reply
The following user said thank you: Metro58