Page 1 of 1
King's Cross December 2019 MF WTT uploaded 15/11/2019 at 14:52 #121662 | |
DavidSplett
142 posts |
King's Cross December 2019 weekday timetable has been uploaded. At present this should be regarded as a beta release as it hasn't yet been fully tested - any issues please feel free to post on this thread. The main change is that this timetable sees Moorgate services revert to running to/from King's Cross during the late evening to allow engineering work on the Northern City Line. Aside from that GTR, HT and GC see minor alterations only. LNER sees slightly more significant changes in the form of a couple of new services plus some services now running through to/from Lincoln and Harrogate. The biggest change is of course the continuing rollout of the class 800 and 801 trains. This has caused a headache as the December diagrams are not yet finalised, and the WTT does not match what the diagrams will do in a number of ways. For the time being I have allocated units as best as possible, but with some degree of mismatch - plus a few cases of where the platforms don't match with what a unit's next working does. Once the December diagrams are finalised then I'll probably do a re-release to match reality. The timetable also includes WTT freight paths with indicative lengths/traction. Unfortunately as things are at present this is the last KX timetable that will easily able to be done, as the May 2020 timetable will require as a minimum the Stevenage bay platform in order to work. Log in to reply The following users said thank you: M1ch4el, Airvan00 |
King's Cross December 2019 MF WTT uploaded 23/12/2019 at 11:40 #122398 | |
lqsignal
16 posts |
3Q11 is too long for KX plat 8. I can't find it in WTT so not sure what it's supposed to do.
Log in to reply |
King's Cross December 2019 MF WTT uploaded 25/12/2019 at 22:28 #122525 | |
Chrisrail
384 posts |
3Q11 IS A COLAS IM UTU working Class 37 + 3 + DBSO about 99m In the TT it is shown as 376m long Log in to reply The following user said thank you: tjtbcork |