Page 1 of 1
ARS Sidings 30/05/2020 at 23:09 #127279 | |
Brytenwalda
19 posts |
I just bought the London Bridge simulation, hoping that with ARS I’d be able to focus on panels of my choosing, but because of all the sidings I need to get permission for, I spend most of the time making calls for trains that wait at red signals. Is there any way to automate these? Why are they not automatic with ARS?
Log in to reply |
ARS Sidings 31/05/2020 at 03:57 #127285 | |
GeoffM
6380 posts |
Because with sidings you risk a head-on as ARS doesn't know what's going on inside. But watch this space for a cut down version of London Bridge for all who purchase(d) it, in the coming weeks. SimSig Boss Log in to reply The following users said thank you: markt, vloris |
ARS Sidings 31/05/2020 at 12:30 #127290 | |
bill_gensheet
1431 posts |
Some depots will have official 'in' and 'out' roads (eg Edinburgh Craigentinny) so the signaller can freely route into one set and the depot out of the other for ARS to pick up. Then calls and slots are only needed for going 'in the out' and vice versa. That needs the signalling to extend into the depot, and space for overlaps etc which Grove Park does not have. Bill Log in to reply |