Page 1 of 1
T585 31/12/2023 at 21:00 #154926 | |
9pN1SEAp
1178 posts |
Hi, I have a TCF on the UNL. I am suspicious that this has prevented 1P06 from being able to enter the simulation from ECHFNF, as it's now running very late (not that I have control of the signal in advance). Thanks Jamie Post has attachments. Log in to view them. Jamie S (JAMS) Log in to reply |
T585 31/12/2023 at 22:51 #154928 | |
GeoffM
6370 posts |
Mantis 40041. Doesn't stop trains entering but does stop them passing the first signal.
SimSig Boss Log in to reply |
T585 01/01/2024 at 09:32 #154935 | |
9pN1SEAp
1178 posts |
Thanks. 1P06 finally appeared at 03:17:07, 64 seconds after the TCF was cleared.
Jamie S (JAMS) Log in to reply |