Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

442s3, andi, jem771, Person82, kpl455, Meld, mailguru23605, Vexed01, tjfrancis (9 users seen recently)

Kings Cross 15th October 2009 (0445 start) v1.01

You are here: Home > Forum > Simulations > Timetables > King's Cross > Kings Cross 15th October 2009 (0445 start) v1.01

Page 1 of 1

Kings Cross 15th October 2009 (0445 start) v1.01 27/03/2012 at 21:17 #30963
IrishDave
Avatar
51 posts
This timetable, written by myself and Ben Woodward (Sacro), as used at the meet in London in March 2012, has now been uploaded. This will chain to the Peterborough and Cambridge timetables of the same date. Please report any bugs or queries in this thread (or by email to mccormick.d.s _obvious symbol_ gmail.com).

The timetable is a reasonably accurate representation of the service on Thursday 15th October 2009. Passenger train descriptions include a descriptor like (FCC 8/365) to indicate the train company, number of carriages, and class of train which operates the service. Freight train descriptions have a similar descriptor, which also includes the length of the train. Watch out for 3J31-3J36 - this is a water-jet railhead treatment train; it will run around the sims all day so delay it at your peril!

With many thanks to Noel Young for much invaluable information (without which this timetable wouldn't be half as good), and to many others for extensive testing.

Last edited: 27/03/2012 at 21:27 by IrishDave
Log in to reply
The following users said thank you: lpeters, Josie, elmer9999uk, northroad, CTCThiago, Tekky, BarryM
Kings Cross 15th October 2009 (0445 start) v1.01 20/05/2013 at 20:27 #44930
northroad
Avatar
872 posts
The railhead treatment train 3J32-A should go through Welwyn GC Platform 3 and not 2 I think. Unless it reverses, as there is no route from either the fast or slow down lines. Excellent sim though.

Geoff

Log in to reply
Kings Cross 15th October 2009 (0445 start) v1.01 20/05/2013 at 21:32 #44932
Sacro
Avatar
1171 posts
" said:
The railhead treatment train 3J32-A should go through Welwyn GC Platform 3 and not 2 I think. Unless it reverses, as there is no route from either the fast or slow down lines. Excellent sim though.

Geoff
Probably yes, though that's how the timetable shows it booked!

Log in to reply
Kings Cross 15th October 2009 (0445 start) v1.01 21/04/2014 at 13:09 #59209
welshdragon
Avatar
315 posts
Just a minor one, but 2R01-A shows as going to Royston, howwever its last location is Letchworth CS
Log in to reply
Kings Cross 15th October 2009 (0445 start) v1.01 21/04/2014 at 13:18 #59210
Sacro
Avatar
1171 posts
" said:
Just a minor one, but 2R01-A shows as going to Royston, howwever its last location is Letchworth CS :)
Where it becomes 2R01-B that goes to Royston, Staff service.

Log in to reply
Kings Cross 15th October 2009 (0445 start) v1.01 12/11/2018 at 00:24 #113250
Edgemaster
Avatar
332 posts
Is there a version 2 of this timetable planned for the new timetable format? Would anyone object to me upgrading the existing one and attaching a draft copy here?
Twitter
Log in to reply
Kings Cross 15th October 2009 (0445 start) v1.01 12/11/2018 at 10:00 #113252
Sacro
Avatar
1171 posts
Edgemaster in post 113250 said:
Is there a version 2 of this timetable planned for the new timetable format? Would anyone object to me upgrading the existing one and attaching a draft copy here?
Is there a need to?

Log in to reply