Page 1 of 1
Solo Operation 12/11/2013 at 18:33 #51436 | |
tommybear
1 posts |
A thought: I am sure like many others my use of SimSig is often on a solo basis - is it possible that using a similar process to ARS running in the background that solo users could in future "isolate" one workstation for live operation and have all the others "robot" controlled? It's probably my age but the old brain starts to seize up with too much scrolling and trying to remember where I need to jump next lol Alternatively is it were possible to mark key points as some kind of "alarm point" so when a train neared them it would remind the befuddled operator to look - Not prototypical but would help this signalman lowest class know what he was doing ! Thanks Log in to reply The following users said thank you: jetblast787, bfcmik, Temple Meads, birchy74 |
Solo Operation 12/11/2013 at 21:00 #51448 | |
fsxfaulder
77 posts |
I know this has definitely been discussed before...
Log in to reply |
Solo Operation 12/11/2013 at 21:58 #51452 | |
Temple Meads
307 posts |
" said:I know this has definitely been discussed before...It has indeed, and if I remember rightly the overall reaction was negative. I personally think it's a great idea, and it could be purely optional of course, maybe a feature that would require quite a lot of development work though? Username TIM in multiplayer Log in to reply |
Solo Operation 12/11/2013 at 22:47 #51455 | |
Stephen Fulcher
2084 posts |
Any ARS simulation can be operated in this manner by disabling the subroutes for the area the user wishes to control.
Log in to reply |
Solo Operation 12/11/2013 at 23:13 #51457 | |
Peter Bennet
5402 posts |
" said:Any ARS simulation can be operated in this manner by disabling the subroutes for the area the user wishes to control.I think that's the closest we can get, FCFS as on Cambridge being an alternative. Peter I identify as half man half biscuit - crumbs! Last edited: 12/11/2013 at 23:14 by Peter Bennet Log in to reply |
Solo Operation 13/11/2013 at 10:49 #51473 | |
clive
2789 posts |
It's open to the developer to add all the ARS data and arrange at startup for it to be either activated or not. But it's a lot of work that can't easily be automated, so some people don't bother. (On the other hand, doing it can make testing a lot easier; I did that in WembleySub, though I didn't keep the data up to date after some last-minute changes.) The debugging panel includes a "simple route" function, which sets routes for trains automatically *if* there's only one route they can take compatible with their timetable. I don't know if Geoff would consider making this an F3 feature instead. Beyond that, any kind of simplified working is up to the developer. As someone pointed out, Cambridge has FCFS working at March and "assume everything is a through train" working at Royston. Log in to reply |