Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Milton Keynes Platform 6

You are here: Home > Forum > Simulations > Released > Rugby > Milton Keynes Platform 6

Page 1 of 1

Milton Keynes Platform 6 10/10/2015 at 10:59 #76760
Class 92
Avatar
359 posts
I have 1G09 at Milton Keynes Central calling up telling me it will be delayed and I wish to replace the signal to let other VT services pass on platform 5 but the front of the train seems to have passed signal KR3251 locking up the points. Is this meant to happen as the train can easily fit in the platform?
Log in to reply
Milton Keynes Platform 6 10/10/2015 at 14:46 #76763
John
Avatar
884 posts



Confirmed. I have also see this type of behavior on other sims.

Post has attachments. Log in to view them.
Log in to reply
Milton Keynes Platform 6 10/10/2015 at 15:19 #76766
Noisynoel
Avatar
989 posts
This is a known core code but that affects numerous sims. Geoff did change the stopping position on the track circuit in an attempt to alleviate the problem but it appears not to have worked.
Noisynoel
Log in to reply
Milton Keynes Platform 6 11/10/2015 at 01:28 #76780
flabberdacks
Avatar
636 posts
Interesting that this has affected a brand new sim.

I reported it happening on SwinDid a while back here: http://www.SimSig.co.uk/index.php?option=com_kunena&view=topic&catid=38&id=39489&Itemid=0

There is a reply to that post with links to it happening in other sims.

I've been playing Kings Cross a lot lately, as well as Wembley ML, Wimbledon and New Street - I've never noticed it happening in any of those sims. I wonder what it might be?

Log in to reply