Tyneside IECC 25/08/2016 at 21:03 #84247
GeoffM
Avatar
6380 posts
After 8 months of work, we're proud to announce Tyneside IECC is now available to purchase. This sim features four busy workstations plus Heighington and Shildon signalboxes (simplified a bit) and chains to York North/South. Speaking of which, if you purchased YorkNS before today then you'll be getting a £5 loyalty discount on Tyneside which should be applied automatically - but don't hang around because this offer is only for a couple of weeks.

Tyneside is, without a doubt, one of the most challenging sims I have played in my opinion. While it might look like there is lots of track, in reality the layout is really restrictive in many places - especially around Newcastle and Gateshead. Short signal sections in some areas as well, so the chances of stitching yourself up with trains facing each other is unusually high.

So, it's not really a beginner sim if you're on your own, but great as a multiplayer. Link in YorkNS and LeedsEW for a well over a hundred miles of direct route as well as the branches.

Enjoy!

SimSig Boss
Log in to reply
The following users said thank you: Vortexhaha, y10g9, tjfrancis, Ben86, northroad, BarryM, sandy221, officer dibble, flabberdacks, headshot119, Rashan 170, Stephen Fulcher, ozrail, Tempest Malice
Tyneside IECC 25/08/2016 at 21:05 #84248
kaiwhara
Avatar
587 posts
Geoff, could you at least wait till Payday? Oh wait too late...
Sorry guys, I am in the business of making people wait!
Log in to reply
Tyneside IECC 25/08/2016 at 21:25 #84250
DaveHarries
Avatar
1287 posts
Looks like 8 months well spent to me, and looks very challenging as well. Will look forward to the first session on this. In the meantime congratulations, well done and thanks to all involved with its testing and release.

Dave

Last edited: 25/08/2016 at 21:26 by DaveHarries
Log in to reply
Tyneside IECC 25/08/2016 at 22:04 #84252
madaboutrains
Avatar
316 posts


Would love to see this place too. Nice sim I will get on payday lol

Post has attachments. Log in to view them.
RIP Feltham Panel 1
Log in to reply
The following users said thank you: ozrail, Ginger, tjfrancis
Tyneside IECC 25/08/2016 at 23:52 #84254
uboat
Avatar
219 posts
In the shop it reads 30-5=30. Please explain what this means?
no pound key on my keyboard. Is 30 with the discount?

Log in to reply
Tyneside IECC 25/08/2016 at 23:55 #84256
headshot119
Avatar
4869 posts
" said:
In the shop it reads 30-5=30. Please explain what this means?
no pound key on my keyboard. Is 30 with the discount?
On its own Tyneside is £35, so £30 is the price after the York discount.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Tyneside IECC 26/08/2016 at 02:26 #84257
uboat
Avatar
219 posts
Thank you for the answer heading to the checkout to pay.
Log in to reply
Tyneside IECC 26/08/2016 at 11:59 #84261
BarryM
Avatar
2158 posts
Oh :cheer: I like the manual signal boxes.

Barry

Barry, Sydney, New South Wales, Australia
Log in to reply
The following user said thank you: Ginger
Tyneside IECC 26/08/2016 at 12:10 #84262
Danny252
Avatar
1461 posts
In the page for Sunderland Workstation, one restriction is given for freights at Sunderland (in the Up direction), but the wording implies that it should also apply to Down trains, and there is a blank bullet point. Has a second restriction gone missing?

(I would imagine it's along the lines of requiring 6205/6207/6209 or 6205/6213/6215 to be clear before 6203 is cleared)

Log in to reply
Tyneside IECC 26/08/2016 at 15:23 #84269
northroad
Avatar
872 posts
Wow,

I have now been on Sim Sig for nearly seven years and the simulation that I have always wanted has now arrived and boy was it worth the wait.

People can now see where my profile name originally came from. It was a really busy location when the works were open and it is good to see that the branch line is now associated once more with traction and rolling stock building.

If anyone does a present day timetable for this at least they will not have to put a station stop in for Tees-side Airport.......unless it's a Sunday of course

Thanks a million to Geoff and ALL associated with this......Christmas has come early. :xmas

Geoff

Last edited: 26/08/2016 at 15:38 by northroad
Reason: added quip to post

Log in to reply
The following user said thank you: Ginger
Tyneside IECC 26/08/2016 at 20:50 #84289
MarkC
Avatar
1105 posts
WOW We've near enough got the whole ECML all thats needed (NOT asking just commenting) Peterborough updating, a Doncaster sim and a sim covering from Newcastle to Berwick-on-Tweed, Now that would be some multi player
Last edited: 26/08/2016 at 21:15 by MarkC
Log in to reply
Tyneside IECC 26/08/2016 at 21:31 #84290
Finger
Avatar
220 posts
What would you need Peterborough updating for?
Log in to reply
Tyneside IECC 26/08/2016 at 21:38 #84291
MarkC
Avatar
1105 posts
" said:
What would you need Peterborough updating for?
Peterborough is still a paged sim, and is I belive not compatable with loader sims

Log in to reply
Tyneside IECC 26/08/2016 at 21:59 #84293
Peter Bennet
Avatar
5419 posts
" said:
" said:
What would you need Peterborough updating for?
Peterborough is still a paged sim, and is I belive not compatable with loader sims
If Doncaster is done the chaining code will need to be added to PBO and then recompiled. Compiling can only be done as loader these days, though it is possible to have a paged representation.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
The following users said thank you: Finger, MarkC
Tyneside IECC 27/08/2016 at 00:35 #84295
Finger
Avatar
220 posts
" said:
" said:
What would you need Peterborough updating for?
Peterborough is still a paged sim, and is I belive not compatable with loader sims

It connects to loader KX fine.

Peter, so is Peterborough not prepared to be connected to Doncaster? Pity.

Log in to reply
Tyneside IECC 27/08/2016 at 00:58 #84296
GeoffM
Avatar
6380 posts
" said:
Peter, so is Peterborough not prepared to be connected to Doncaster? Pity.
The dev needs to know how the other end is going to look and that information might not have been available at the time. For example, at what point does Peterborough notify Doncaster via the train describer that a train is approaching? How many track circuits back over the boundary are shown? Sometimes devs set up chaining data in the expectation that it will probably be like it is, but most ends up changing at least a little anyway once the next sim is developed and more thoroughly researched.

That said, I don't envisage the chain between these two to be that onerous. No routes, just automatic signals on one way tracks, which makes life a whole lot easier. (He says :whistle: )

SimSig Boss
Log in to reply
Tyneside IECC 27/08/2016 at 04:32 #84297
ozrail
Avatar
197 posts
I've noticed that Hett Mill, Killingworth and Dam Dykes level crossings need to be lowered manually while East Boldon is lowered by the ARS. Is this normal?
Log in to reply
Tyneside IECC 27/08/2016 at 08:40 #84300
postal
Avatar
5269 posts
" said:
I've noticed that Hett Mill, Killingworth and Dam Dykes level crossings need to be lowered manually while East Boldon is lowered by the ARS. Is this normal?
It may be apochryphal, but I heard that in the early days of the IECC, GNER (which ran the ECML trains in that era) arranged regular liaison meetings when groups of drivers went into the IECC to talk to the signallers (while they were working the panel, not as a meeting-room job). One of the bones of contention in those meetings was the number of times that trains were being checked on the approach to Hett Mill LC. The tale I heard is that one meeting became a little heated as the signaller on that particular workstation and the drivers had different points of view, to the extent that actual operation of the workstation became lost in the noise. The workstation only came back into focus when there was a phone call from a driver waiting at red at Hett Mill.

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Log in to reply
The following users said thank you: GeoffM, flabberdacks
Tyneside IECC 27/08/2016 at 19:20 #84325
GeoffM
Avatar
6380 posts
" said:
I've noticed that Hett Mill, Killingworth and Dam Dykes level crossings need to be lowered manually while East Boldon is lowered by the ARS. Is this normal?
Actually just crossing logic rather than ARS but yes, East Boldon has auto lower while the others don't.

SimSig Boss
Log in to reply
Tyneside Bugs 27/08/2016 at 21:37 #84335
Splodge
Avatar
721 posts
Had a couple more duplicated-path trains enter from both Northallerton and Morpeth. Stupidly I forgot to note down exactly which ones :doh

Also had an issue with 5M79 - I couldn't get the call on from T503 to platform 3 to set. The route highlighted complete with overlap (which I don't think should happen as the platform was occupied); the overlap dropped out after half a second but the call on aspect wouldn't light so I had to authorise the train past at danger.

And one very minor aesthetic point - the banner repeater for T96 stays on when a route is set.

There's the right way, the wrong way and the railway.
Log in to reply
Tyneside IECC 27/08/2016 at 21:54 #84336
ozrail
Avatar
197 posts
Also there doesn't seem to be a penalty for leaving the gates down.
Log in to reply
Tyneside IECC 28/08/2016 at 19:54 #84376
Andrew G
Avatar
552 posts
" said:
" said:
I've noticed that Hett Mill, Killingworth and Dam Dykes level crossings need to be lowered manually while East Boldon is lowered by the ARS. Is this normal?
Actually just crossing logic rather than ARS but yes, East Boldon has auto lower while the others don't.
I suspect this is related to the respective commissioning dates.

Sunderland work station was only commissioned in 2002 - the other 3 work stations were commissioned in 1991.

Log in to reply
Tyneside IECC 28/08/2016 at 20:39 #84380
Steamer
Avatar
3997 posts
Are the west end bays at Newcastle permissive? Sectional Appendix says yes, but I've got a train at 483 with a route set into (occupied) P12 and the subsidiary won't clear?
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Last edited: 28/08/2016 at 20:41 by Steamer
Log in to reply
Tyneside IECC 29/08/2016 at 12:40 #84397
jc92
Avatar
3701 posts
I think a handy optional feature might be a train approaching X level crossing message. Its easy to get distracted on the other side of the panel and bring a class one to a halt.
"We don't stop camborne wednesdays"
Log in to reply
Tyneside IECC 29/08/2016 at 13:05 #84399
Ray
Avatar
211 posts
The track layout to the east of Newcastle Central Station is only a shadow of its former self. If you search youtube you will see photographs going back to 20th Century showing the famous diamond cross overs. Pity its all been swept away by modernity.
Log in to reply