Page 1 of 1
Shipley P3X? 30/09/2016 at 12:33 #85525 | |
MarkC
1105 posts |
Just playing this sim and having referanced wiki I am confused, in wiki it says that 91+mk4 trains will use P3X at Shipley, but it is not in the availible platform options in the sim. All I can say is one is wrong, but which one I daren't ask. Log in to reply |
Shipley P3X? 30/09/2016 at 12:40 #85526 | |
headshot119
4869 posts |
mark265 in post 85525 said:Just playing this sim and having referanced wiki I am confused, in wiki it says that 91+mk4 trains will use P3X at Shipley, but it is not in the availible platform options in the sim.I'm not sure whether it should be included in the simulation, only the developer can answer that. But an "X" on the end of a platform usually means the train needs the full length, or needs the signal at the end off in order to be fully platformed. I'm fairly sure the later is the case at Shipley in real life. "Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer Log in to reply |
Shipley P3X? 30/09/2016 at 12:44 #85527 | |
MarkC
1105 posts |
headshot119 in post 85526 said:mark265 in post 85525 said:According to wiki it says it uses the platform code 3X at ShipleyJust playing this sim and having referanced wiki I am confused, in wiki it says that 91+mk4 trains will use P3X at Shipley, but it is not in the availible platform options in the sim.I'm not sure whether it should be included in the simulation, only the developer can answer that. But an "X" on the end of a platform usually means the train needs the full length, or needs the signal at the end off in order to be fully platformed. I'm fairly sure the later is the case at Shipley in real life. At Skipton the platform code used for HST's is 2X, which is in the sim Log in to reply |
Shipley P3X? 15/02/2017 at 01:09 #93124 | |
Essexgirl
42 posts |
mark265 in post 85527 said:headshot119 in post 85526 said:In real life (as a signaller working this workstation), I can confirm that the VTEC services do use platform 3X in the up direction at Shipley, this is because the SBSI state that before routing the train into P3 the route from L3966 to L3934 must be cleared, to enable maximum amount of the train to be on the platform. Likewise at Skipton platform 2X is used so that the route from L4033 to LOS can be set, as the HST/Mk4 stopping point is passed the signal (but not the block jojnt), these trains always call in to confirm they are at a stand and that L4033 can be replaced to dangermark265 in post 85525 said:According to wiki it says it uses the platform code 3X at ShipleyJust playing this sim and having referanced wiki I am confused, in wiki it says that 91+mk4 trains will use P3X at Shipley, but it is not in the availible platform options in the sim.I'm not sure whether it should be included in the simulation, only the developer can answer that. But an "X" on the end of a platform usually means the train needs the full length, or needs the signal at the end off in order to be fully platformed. I'm fairly sure the later is the case at Shipley in real life. Log in to reply The following users said thank you: BarryM, Ben86 |
Shipley P3X? 15/02/2017 at 22:35 #93151 | |
JamesN
1611 posts |
#16705 applies
Log in to reply |