Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Person82, 442s3, andi, Fendahl, mattfleaydaly, jem771, BenWright (7 users seen recently)

S1009 Signal

You are here: Home > Forum > Simulations > Released > Sheffield (Obsolete .exe) > S1009 Signal

Page 1 of 1

S1009 Signal 18/10/2010 at 07:13 #1914
button_pusher
Avatar
56 posts
I've had a search but can't find anything.

I'm playing the 1994 timetable and had 0Z99 enter from Barrow Hill DD to S1009 signal. I then set the route from 1009 > 247 (which incidentally doesn't TORR) and the signal immediately cleared whilst the points flashed out of correspondence as they were moving. I know its only a shunt signal but its still a WSF!

Cheers

Log in to reply
S1009 Signal 18/10/2010 at 07:13 #12041
button_pusher
Avatar
56 posts
I've had a search but can't find anything.

I'm playing the 1994 timetable and had 0Z99 enter from Barrow Hill DD to S1009 signal. I then set the route from 1009 > 247 (which incidentally doesn't TORR) and the signal immediately cleared whilst the points flashed out of correspondence as they were moving. I know its only a shunt signal but its still a WSF!

Cheers

Log in to reply
S1009 Signal 19/10/2010 at 02:29 #12054
UKTrainMan
Avatar
1803 posts
I'm not sure if the signal would TORR as it's a shunt signal, but regarding the issue of the signal clearing immediately I have also noticed this previously and your post has reminded me of this. I'll skip loading up Sheffield to reproduce this 'suspected bug'(?) as I have already noticed it previously, happening the same way button_pusher describes.

BTW, WSF?

BTW = By The Way

Any views and / or opinions expressed by myself are from me personally and do not represent those of any company I either work for or am a consultant for.
Log in to reply
S1009 Signal 19/10/2010 at 03:23 #12057
Jsun
Avatar
212 posts
Wrong Side Faliure.
Also duplicated the results easily.

Log in to reply
S1009 Signal 20/10/2010 at 14:28 #12067
Tristan
Avatar
60 posts
I have also just duplicated this, Loaded Sheffield then set the points facing the Depo, set the rought from S1009 to S247 and it clears instantly while the points are still switching.This is Definatly a wrong side failure.
Log in to reply