Bromsgrove Oil Terminal (Unitank) 06/06/2011 at 12:48 #3159
mikesmith83uk
Avatar
14 posts
Hi all

I am trying to signal train 6V21 into Bromsgrove Oil Terminal (Unitank). I can signal the train to wait at signal 18 however when I try to signal the train into the oil terminal the message 'no overlap available appears'.

I have consulted the guide and found the section on overlaps which advised me to hold the train for over a minute at which point the overlap should dissapear allowing the me to signal the train forward but it doesn't happen in this instance. Is there a certain route trains must take to enter into the oil terminal when crossing from the Down main?

Please help!

Log in to reply
Bromsgrove Oil Terminal (Unitank) 06/06/2011 at 12:48 #16369
mikesmith83uk
Avatar
14 posts
Hi all

I am trying to signal train 6V21 into Bromsgrove Oil Terminal (Unitank). I can signal the train to wait at signal 18 however when I try to signal the train into the oil terminal the message 'no overlap available appears'.

I have consulted the guide and found the section on overlaps which advised me to hold the train for over a minute at which point the overlap should dissapear allowing the me to signal the train forward but it doesn't happen in this instance. Is there a certain route trains must take to enter into the oil terminal when crossing from the Down main?

Please help!

Log in to reply
Bromsgrove Oil Terminal (Unitank) 06/06/2011 at 13:15 #16370
jc92
Avatar
3685 posts
Online
have you tried using the shunt route (yellow traingle above s18) this will allow you to set a route into unitank no problems
"We don't stop camborne wednesdays"
Log in to reply
Bromsgrove Oil Terminal (Unitank) 06/06/2011 at 15:41 #16374
mikesmith83uk
Avatar
14 posts
Not yet, i will try when I get chance, thanks for the prompt response and I will let you know how I get on.
Log in to reply
Bromsgrove Oil Terminal (Unitank) 06/06/2011 at 20:11 #16384
sloppyjag
Avatar
480 posts
Can't find this train on any of the timetables loaded on my PC so can't test this particular train. However, if it is long enough not to clear the overlap for preceding signal no. 16 on the Down Main then the overlap for sig. 18 will not clear either. In this case the route from sig.18 into Unitank sidings will not set until the route from 16 to 18 is manually cleared. This may be why you are unable to set the route.
Planotransitophobic!
Log in to reply
Bromsgrove Oil Terminal (Unitank) 06/06/2011 at 21:56 #16394
mikesmith83uk
Avatar
14 posts
Its timetable Gloucester 1985 v1.112 0530, train 6V21 00.09 Port Clarence Phillips to Bromsgrove unitank. Its 321m in length
Log in to reply
Bromsgrove Oil Terminal (Unitank) 06/06/2011 at 22:18 #16395
AndyG
Avatar
1842 posts
As SJ says, you may need to manually cancel the route set at 16 once the train has passed it, to clear the overlap.

Other way is as JC says, route from 16 to the 'shunt ahead' white triangle, and you'll be able to set the route 18 - Unitank Sdg straight away.

I can only help one person a day. Today's not your day. Tomorrow doesn't look too good either.
Log in to reply
Bromsgrove Oil Terminal (Unitank) 09/06/2011 at 12:04 #16444
mikesmith83uk
Avatar
14 posts
Problem solved! Thank you all!