i beleive its already been requested that the line to ollerton and high marnham be represented in the next possible release, even if only as an entrance/ exit point. however whilst doing a bit of research it appears the line is still officially in use as a test track ( i knew this much) and is still connected to NR lines at thoresby (i didnt know this) and is still used for testing stock. it may therefore be an idea to provide ollerton in modern mode aswell to allow stock/ test train transfers on and off the line. any thoughts? "We don't stop camborne wednesdays" Log in to reply |
high marnham test track 20/06/2011 at 02:23 #16757 | |
jc92
3685 posts |
i beleive its already been requested that the line to ollerton and high marnham be represented in the next possible release, even if only as an entrance/ exit point. however whilst doing a bit of research it appears the line is still officially in use as a test track ( i knew this much) and is still connected to NR lines at thoresby (i didnt know this) and is still used for testing stock. it may therefore be an idea to provide ollerton in modern mode aswell to allow stock/ test train transfers on and off the line. any thoughts? "We don't stop camborne wednesdays" Log in to reply |
high marnham test track 20/06/2011 at 09:36 #16760 | |
onlydjw
456 posts |
Correct, it is a NR test track for the testing of on track plant and other specialist equiment, There are regular possession trains to/from Toton (usually running as 6H95), which are timed to Thoresby Colliery Jn, where the test track starts. Ollerton closed many years ago as a coal loading point, only Thoresby & Welbeck remaining, and some odd bits from Clipstone in recent years. God bless, Daniel Wilson Log in to reply |
high marnham test track 21/06/2011 at 18:06 #16821 | |
NoddyAsh
12 posts |
onlydjw said:Correct, it is a NR test track for the testing of on track plant and other specialist equiment, There are regular possession trains to/from Toton (usually running as 6H95), which are timed to Thoresby Colliery Jn, where the test track starts.Welbeck has now closed. Log in to reply |
high marnham test track 21/06/2011 at 18:50 #16823 | |
jc92
3685 posts |
yes welbeck colly jcn points are clipped and collared soon to be plain lined. only thoresby still produces. welbeck has now been demolished