Page 1 of 1
Question out of curiosity 04/02/2013 at 05:02 #41130 | |
MarkC
1105 posts |
I was just wondering if there are any plans to update the KX and Cambrigde sims to include changes made in real life IE: KX -- the addition of P0 and the Hitchen flyover Cambridge -- the new island platform as well as any other changes made to layouts Log in to reply |
Question out of curiosity 04/02/2013 at 08:44 #41132 | |
Danny252
1461 posts |
" said:KX -- the addition of P0 and the Hitchen (sic) flyoverBit hard to add something that isn't even complete yet! Also, I'd go with the answer probably being "no" in both cases. Last edited: 04/02/2013 at 08:44 by Danny252 Log in to reply The following user said thank you: MarkC |
Question out of curiosity 04/02/2013 at 16:25 #41139 | |
GeoffM
6377 posts |
" said:" said:Normally that would be right... but in this case scheme plans exist and those two things are relatively minor fixes.KX -- the addition of P0 and the Hitchen (sic) flyoverBit hard to add something that isn't even complete yet! I also noticed some plans to turn the Up Goods from Bounds Green to Holloway North into passenger standards, with realignment of the platforms at Alexandra Palace (maybe Hornsey too - I forget), changing some crossovers between the UG and US too. That is a bit more involved and I don't know whether that's still a proposal or an idea that will become reality. Anybody know? SimSig Boss Log in to reply The following user said thank you: MarkC |
Question out of curiosity 04/02/2013 at 17:11 #41143 | |
John
884 posts |
Due for completion in 2014 apparently. http://www.networkrailconsulting.co.uk/our-projects/finsbury-park-to-alexandra-palace-capacity-scheme/ A few photos of work in progress here http://www.londonreconnections.com/2012/in-pictures-work-at-finsbury-park/ Log in to reply The following users said thank you: MarkC, GeoffM |
Question out of curiosity 04/02/2013 at 18:05 #41146 | |
Peter Bennet
5402 posts |
" said:The new/upgraded line is in place and Alexandra Palace has had a new platform for a while. FP platform is a mass of rubble. I think they are also re-instating the old [Coronation?] Carriage sidings for the extended depot for the TL trains as part of/a parallel project - plenty of activity going on. Peter I identify as half man half biscuit - crumbs! Log in to reply |
Question out of curiosity 05/02/2013 at 12:20 #41172 | |
metcontrol
227 posts |
New earthworks have begun in the Belle Isle area (just outside King's Cross). I can only presume these are in relation to joining us (GN) up with the Thameslink route. They are digging the embankment that separates the main from a tunnel created when HS1 was being built. Also a lot of track and signalling works have been taking place in the Langley Junction area. Adding this to the flyover and the Finsbury Park works, I don't think I can recall this much work taking place since the route was electrified. Log in to reply |
Question out of curiosity 05/02/2013 at 15:58 #41183 | |
John
884 posts |
Commissioning of Canal Tunnel, Canal Tunnel Jcn and Belle Isle Jcn. http://www.networkrail.co.uk/browse%20documents/network%20code/network%20change/current%20proposals/thameslink/ncn%20canal%20tunnels/ncg12012tlp008%20ncn%20for%20canal%20tunnels.pdf Log in to reply |
Question out of curiosity 07/02/2013 at 12:36 #41282 | |
metcontrol
227 posts |
Thanks very much for that link. It confirms my suspicions and also gives a timescale of when the works will be carried out.
Log in to reply |
Question out of curiosity 08/02/2013 at 15:22 #41314 | |
MarkC
1105 posts |
Thanks for all the info
Log in to reply |