Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Person82, 442s3, andi, 0D07, jem771, Terry, rodney30 (7 users seen recently)

Kings Cross 4 Day Timetable November 2013

You are here: Home > Forum > Simulations > Timetables > King's Cross > Kings Cross 4 Day Timetable November 2013

Page 2 of 2

Kings Cross 4 Day Timetable November 2013 12/01/2014 at 17:49 #53821
dwelham313
Avatar
139 posts
Haha oh yes! Its been a long weekend! Entry time should be 43+58! Thankfully this is the Moorgate Fire Procedure trip so won't do any harm sitting at Drayton Park for a few extra hours!
Log in to reply
Kings Cross 4 Day Timetable November 2013 12/01/2014 at 17:54 #53822
John
Avatar
884 posts
" said:
... won't do any harm sitting at Drayton Park for a few extra hours!
So long as you don't count 5E94-2 and 5G40-2 trapped outside Drayton Park for four hours harm lol :cheer:

Log in to reply
Kings Cross 4 Day Timetable November 2013 12/01/2014 at 18:11 #53823
dwelham313
Avatar
139 posts
Oh blimey I forgot about those. 5K98-3 is a football extra too and not the Moorgate trip as I had thought so will need amending to show correct entry time of 43:58
Log in to reply
Kings Cross 4 Day Timetable November 2013 14/01/2014 at 08:59 #53865
John
Avatar
884 posts
dwelham313

I've been gradually chipping away at this timetable, and having finally arrived at Sunday, it strikes me that the relatively sedate nature of the Sunday service would make it ideal for newcomers to the sim, so I was wondering whether you'd be prepared to split Sunday off from the main timetable and upload?

I realise that one could simply start the sim at 48:00 or later, but there would be numerous berthing trains missing.

Log in to reply
Kings Cross 4 Day Timetable November 2013 14/01/2014 at 09:53 #53866
dwelham313
Avatar
139 posts
Hi John,

I did consider uploading Sunday as a separate TT but simply didn't have time. Perhaps I'll have a go in the next few weeks with plenty of seeded trains so it can have a latish start and skip the overnight section.

Log in to reply
The following user said thank you: John
Kings Cross 4 Day Timetable November 2013 14/01/2014 at 14:10 #53874
Dick
Avatar
387 posts
I just abandoned the timetable for 5K98-3 and put it in platform 2 at Drayton Park until right time. 52 hours in and running at 95% score so far.
Log in to reply
Kings Cross 4 Day Timetable November 2013 24/01/2016 at 13:13 #80099
Jan
Avatar
906 posts
Finally got as far as Saturday morning - having to set up the various engineering works for each night makes a nice touch.
One thing I've noticed though is that most trains requiring rules [1] have them set up for Friday only, with no rules present for the other days.

[1] E.g. trains working through Ferme Park CS or Letchworth CS, some infrastructure trains (3Jxx) and trains reversing/droping off units off-sim in Royston.

Edit: Actually the rules are missing for Friday as well, only it seems that I added them myself a long time ago. I'd completely forgotten about that...

Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Last edited: 24/01/2016 at 21:15 by Jan
Log in to reply
Kings Cross 4 Day Timetable November 2013 21/05/2016 at 14:05 #82569
geezer63ed
Avatar
17 posts
I'm about to start this timetable. Should I use the old or new layout? Its not clear to me.

Both old and new layouts come up with a warning saying they may be incompatible with this timetable.

Am I doing something wrong?

Many thanks

Graham

Last edited: 21/05/2016 at 14:06 by geezer63ed
Log in to reply
Kings Cross 4 Day Timetable November 2013 21/05/2016 at 15:41 #82572
y10g9
Avatar
895 posts
As far as I understand, the Timetable was produced before the current version of Kings Cross was released, hence the warnings. In theory it should be able to run in the new layout as the flyover at Hitchin opened in June 2013
Log in to reply
The following user said thank you: geezer63ed
Kings Cross 4 Day Timetable November 2013 21/05/2016 at 15:47 #82573
geezer63ed
Avatar
17 posts
Thanks y10g9. It seemed the best bet to me; I'm also assuming the Hitchin flyover is the reason for the warning.
Log in to reply
Kings Cross 4 Day Timetable November 2013 21/05/2016 at 16:40 #82578
Jan
Avatar
906 posts
Despite the warning, this timetable is clearly intended for modern mode - there are a few route learners booked over the flyover, plus more importantly, it's making use of platform 0 at King's Cross.
Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick.
Log in to reply
Kings Cross 4 Day Timetable November 2013 23/05/2016 at 22:30 #82612
dwelham313
Avatar
139 posts
I wrote this timetable for the old version and it was in final testing when the loader was released, so was converted for the loader before public release which is possibly why warnings are coming up. It is intended to be run in modern mode.

One or two timetable errors crept through which I think are all reported in this thread, good luck with the timetable!

Log in to reply
The following user said thank you: geezer63ed
Kings Cross 4 Day Timetable November 2013 20/10/2016 at 23:46 #86939
Airvan00
Avatar
129 posts
Small correction. Timetable should end at 99:00 not 27:00 Otherwise the end off session warning comes up at 3AM on the Saturday. And somehow that interferes with the 0300 automatic save which is skipped.

Up to the second morning and enjoying it so far :-)

Log in to reply