Page 1 of 1
Week-Long Timetables 24/05/2014 at 22:35 #60917 | |
Gwasanaethau
![]() 510 posts |
Hi all, I am currently in the process of writing a week-long timetable, but have just realised (after two years of work, on-and-off :blush ![]() Thanks! Gwasanaethau (Mark). Log in to reply |
Week-Long Timetables 24/05/2014 at 23:36 #60924 | |
Finger
![]() 220 posts |
That should be possible (the limit of the data representation in the WTT file is some ~600000 hours, don't know about internal limits of SimSig though). If you're doing TT loader sims, you could develop the timetable per partes, shift them using XSLT and quite trivially unite them.
Log in to reply The following user said thank you: Gwasanaethau |
Week-Long Timetables 25/05/2014 at 00:52 #60927 | |
Gwasanaethau
![]() 510 posts |
Thanks for the info Finger. Unfortunately, the sim I am writing the timetable for is a pre-loader sim (specifically South Humberside), so I cannot use XML at this time.
Log in to reply |