Ffestiniog Branch 209 v1.2 01/07/2014 at 23:37 #62369
Nutter
Avatar
83 posts
Hi.

Is it normal for the trains on the Ffestiniog branch to loose a bit of time even if given a clear run.

I currently have 2D11 (First train 'north' of the day) 6 mins down at Llanrwst despite having a clear run to Ffestiniog and back.

Is this a timetable bug, a sim bug or just what happens in real life

Many thanks
Mark

Log in to reply
Ffestiniog Branch 209 v1.2 02/07/2014 at 00:55 #62370
Stephen Fulcher
Avatar
2088 posts
It is normal, but not a bug with the simulation.

Most of the stations between Llandudno Junction and Blaenau Ffestiniog are request stops, but that cannot at present be simulated in SimSig, so the train calls at all stations.

Log in to reply
Ffestiniog Branch 209 v1.2 02/07/2014 at 05:46 #62371
Peter Bennet
Avatar
5419 posts
" said:
It is normal, but not a bug with the simulation.

Most of the stations between Llandudno Junction and Blaenau Ffestiniog are request stops, but that cannot at present be simulated in SimSig, so the train calls at all stations.
Request stops: Interesting question; I think it can now be done on a random basis.

Peter

I identify as half man half biscuit - crumbs!
Last edited: 02/07/2014 at 05:47 by Peter Bennet
Log in to reply
Ffestiniog Branch 209 v1.2 02/07/2014 at 12:44 #62375
onlydjw
Avatar
456 posts
How do you select a location to be a request stop?

There's no option in the TT editor for it.

I can't see anything on the Wiki for "request stop".

All I can see is Mantis 636, and that's quite old!

God bless, Daniel Wilson
Last edited: 02/07/2014 at 13:17 by onlydjw
Log in to reply
Ffestiniog Branch 209 v1.2 02/07/2014 at 13:27 #62376
Noisynoel
Avatar
989 posts
That's because it's not yet been implemented
Noisynoel
Log in to reply
The following user said thank you: LucasLCC
Ffestiniog Branch 209 v1.2 02/07/2014 at 19:47 #62389
Peter Bennet
Avatar
5419 posts
" said:
How do you select a location to be a request stop?

There's no option in the TT editor for it.

I can't see anything on the Wiki for "request stop".

All I can see is Mantis 636, and that's quite old!
You can't which is the point of the tread.
However, the developer can add some coding albeit a bit crude.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
Ffestiniog Branch 209 v1.2 02/07/2014 at 20:18 #62392
arabianights
Avatar
138 posts
Somewhat off topic, but one implication of this is that the timetable for Ffestiniog is "tight" rather than the usual, er, lesiurely TT of heritage railways. Why are they in such a hurry?
Log in to reply
Ffestiniog Branch 209 v1.2 02/07/2014 at 20:31 #62393
postal
Avatar
5269 posts
Online
" said:
Somewhat off topic, but one implication of this is that the timetable for Ffestiniog is "tight" rather than the usual, er, lesiurely TT of heritage railways. Why are they in such a hurry? :D
The Ffestiniog Railway probably isn't in too much of a hurry but the Arriva Trains Wales line from Llandudno Junction to Blaenau Ffestiniog probably will be tight if all the request stops are called.

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Log in to reply
Ffestiniog Branch 209 v1.2 02/07/2014 at 21:58 #62397
Danny252
Avatar
1461 posts
" said:
rather than the usual, er, lesiurely TT of heritage railways
Oh, how I wish our SVR timetables were "leisurely" enough for some of our busier days...

Last edited: 02/07/2014 at 21:59 by Danny252
Log in to reply
Ffestiniog Branch 209 v1.2 02/07/2014 at 22:42 #62401
Late Turn
Avatar
699 posts
" said:
" said:
rather than the usual, er, lesiurely TT of heritage railways
Oh, how I wish our SVR timetables were "leisurely" enough for some of our busier days...

Likewise for the GCR - Swithland is anything but leisurely during the busiest special events!

Log in to reply