Page 1 of 1
Wembley Main Line - 0M11 not getting call on signal 09/08/2014 at 16:48 #63684 | |
Muzer
718 posts |
Do I have to use the track circuit override button for this? I note it's not documented in the manual like they usually are.
Last edited: 09/08/2014 at 16:49 by Muzer Log in to reply |
Wembley Main Line - 0M11 not getting call on signal 09/08/2014 at 17:01 #63686 | |
jc92
3687 posts |
the TCO's need to be used for any call on into Euston. rule of thumb: if theres a TCO, it will need to be used.
"We don't stop camborne wednesdays" Log in to reply |
Wembley Main Line - 0M11 not getting call on signal 09/08/2014 at 17:25 #63688 | |
Jan
906 posts |
Not quite: From my experience they only need to be used if both platform track circuits are occupied. If only one track circuit is occupied, call-on usually works automatically.
Two million people attempt to use Birmingham's magnificent rail network every year, with just over a million of them managing to get further than Smethwick. Last edited: 09/08/2014 at 17:25 by Jan Log in to reply |
Wembley Main Line - 0M11 not getting call on signal 09/08/2014 at 18:12 #63692 | |
Danny252
1461 posts |
Having tested a couple of platforms, I have to side with Jan on this one.
Log in to reply |