Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Exeter sim - new stations.....

You are here: Home > Forum > Simulations > Released > Exeter > Exeter sim - new stations.....

Page 1 of 1

Exeter sim - new stations..... 30/08/2014 at 23:40 #64228
DaveHarries
Avatar
1285 posts
Hi all,

Two things I have recently round out. First of all comes this:

- - - - - - - - - -

New station for Exmouth branch
Work was due to begin on a new station in Exeter during July.

Exeter Newcourt will cost £1.5million , be of relatively simple construction, and is being built on the Exmouth branch between Digby & Sowton and Topsham. It is expected to be open before the end of 2014 and will have a 30-minute service in each direction.

[Railway Magazine, August 2014, Page 88]

- - - - - - - - - -

And secondly, according to Wikipedia, the new station being built at Cranbrook (near Exeter) is - or should be - also in the process of being built. This station, to be located between Whimple and Pinhoe, is expected to open in January 2015 if the weather allows.

http://en.wikipedia.org/wiki/Cranbrook_(Devon)_railway_station

If those stations were added it might be possible to incorporate both by giving the Exeter sim a 2015 era.

HTIOI,
Dave

Log in to reply
Exeter sim - new stations..... 31/08/2014 at 13:15 #64239
Class 92
Avatar
359 posts
In the 2015 era the level crossing at Taunton could also be removed?
Last edited: 31/08/2014 at 13:15 by Class 92
Log in to reply
Exeter sim - new stations..... 31/08/2014 at 13:50 #64240
bugali
Avatar
78 posts
Also the overlap of signal 337 (at the up end of platform 3) should be amended, as it behind point 855. This is what it is like on the real panel. Thus alowing a waterloo to exeter arrive at the same time as a barnstaple to Exmouth.

As well as this a the auto buton on PN1 is not there in real life.

Also signals E637 and E324 at norton Fitzwarren do not show a yellow when routing on and off of the WSR. This is because the proceser cards thinks it a shunt rout.

I would rather have that fixed than a few stations added. With thes 2 new station being added Exmouth jn box is going to possibly have a new panel fitted and some resigning, so lets wate and see what happens!


Alistair

Log in to reply
Exeter sim - new stations..... 31/08/2014 at 14:16 #64244
Muzer
Avatar
718 posts
Why would they need a new panel fitted just for a new station - or is that designed to increase capacity/line speed or something to make up for the extra stop?


If Exeter IS refreshed in the future (since it's been refreshed relatively recently I expect it'll either be a while or just a small update), it'd be nice if the real NSTR feature is used for the Barnstaple branch (am I right in thinking it's now in the core code, as used in North Wales Coast?) rather than the strange ARS stuff.

Last edited: 31/08/2014 at 14:18 by Muzer
Log in to reply
Exeter sim - new stations..... 31/08/2014 at 16:21 #64248
Peter Bennet
Avatar
5402 posts
I am aware that there are some errors in the Sim representation and have a long-term plan to recast starting at Totnes (part done).

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
The following users said thank you: Temple Meads, DaveHarries, maxand
Exeter sim - new stations..... 31/08/2014 at 23:00 #64269
pedroathome
Avatar
915 posts
" said:
Also the overlap of signal 337 (at the up end of platform 3) should be amended, as it behind point 855. This is what it is like on the real panel. Thus alowing a waterloo to exeter arrive at the same time as a barnstaple to Exmouth.
Has this not already been changed?

Last edited: 31/08/2014 at 23:01 by pedroathome
Log in to reply
Exeter sim - new stations..... 01/09/2014 at 00:42 #64270
Temple Meads
Avatar
307 posts
" said:
" said:
Also the overlap of signal 337 (at the up end of platform 3) should be amended, as it behind point 855. This is what it is like on the real panel. Thus alowing a waterloo to exeter arrive at the same time as a barnstaple to Exmouth.
Has this not already been changed?
Correct:


Post has attachments. Log in to view them.
Username TIM in multiplayer
Log in to reply
Exeter sim - new stations..... 01/09/2014 at 02:24 #64272
maxand
Avatar
1637 posts
Is there any plan to convert Red Cow LC into an underpass or overpass?
Log in to reply
Exeter sim - new stations..... 01/09/2014 at 05:31 #64275
Peter Bennet
Avatar
5402 posts
" said:
Is there any plan to convert Red Cow LC into an underpass or overpass?
I have no plan to go that far.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
Exeter sim - new stations..... 01/09/2014 at 05:55 #64276
kaiwhara
Avatar
587 posts
" said:
" said:
Is there any plan to convert Red Cow LC into an underpass or overpass?
I have no plan to go that far.

Peter
:woohoo: :silly: :doh

Sorry guys, I am in the business of making people wait!
Log in to reply
Exeter sim - new stations..... 01/09/2014 at 07:11 #64278
GW43125
Avatar
495 posts
" said:
Is there any plan to convert Red Cow LC into an underpass or overpass?
Is there a plan to do that IRL?
Jamie.

Log in to reply
Exeter sim - new stations..... 01/09/2014 at 07:29 #64279
Steamer
Avatar
3985 posts
" said:
Is there any plan to convert Red Cow LC into an underpass or overpass?
Judging by Google Maps, it would be a bit tricky.

At least they did Silk Mill.

"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
Exeter sim - new stations..... 01/09/2014 at 08:55 #64281
GW43125
Avatar
495 posts
" said:
" said:
Is there any plan to convert Red Cow LC into an underpass or overpass?
Judging by Google Maps, it would be a bit tricky.

I'm guessing that's a no then?

Log in to reply
Exeter sim - new stations..... 01/09/2014 at 09:59 #64282
LucasLCC
Avatar
94 posts
" said:
" said:
Is there any plan to convert Red Cow LC into an underpass or overpass?
Is there a plan to do that IRL?
Jamie.
The road and building layout there would make it nearly impossible to do. On the St Davids side you have a three way junction and a car park immediately as you come off the crossing. On the other side you have car parks and depot access.

Lucas

Log in to reply
The following user said thank you: GW43125
Exeter sim - new stations..... 01/09/2014 at 12:20 #64285
pedroathome
Avatar
915 posts
" said:
Is there any plan to convert Red Cow LC into an underpass or overpass?
There really isn't much room on the ground to do this. Given that the road which goes over Red Cow has a junction just a few yards further on from the crossing on one end

Log in to reply
Exeter sim - new stations..... 01/09/2014 at 12:24 #64287
maxand
Avatar
1637 posts
I really meant, in real life is there any proposal to eliminate Red Cow LC?

(Being far enough from the wood to see the trees) let's face it, it must be a real bottleneck for road traffic running the gauntlet with trains constantly crossing. Bit like Moses crossing the Red Sea. :lol:

Not asking Peter to pre-empt the hand of God here.

(overlooked others who replied to my previous post, sorry. And thanks for the nice Google Maps pic.).

Last edited: 01/09/2014 at 12:33 by maxand
Log in to reply
Exeter sim - new stations..... 01/09/2014 at 17:35 #64292
LucasLCC
Avatar
94 posts
" said:
let's face it, it must be a real bottleneck for road traffic running the gauntlet with trains constantly crossing. Bit like Moses crossing the Red Sea. :lol:
You could say that. At times the queue for the crossing will go a considerable way along on the city side. I've even know the queue to reach Central station at times.

Lucas

Log in to reply
Exeter sim - new stations..... 01/09/2014 at 18:27 #64295
lazzer
Avatar
634 posts
The other day, I was one of FOUR consecutive trains in a row that the barriers were down for. It's not an ideal location for a crossing in this day and age of traffic levels.
Log in to reply
Exeter sim - new stations..... 01/09/2014 at 18:30 #64296
John 23
Avatar
176 posts
" said:
I am aware that there are some errors in the Sim representation and have a long-term plan to recast starting at Totnes (part done).

Peter
One of the corrections to match RL would be the inclusion of a slot to access the Buckfastleigh Branch (SDR) from E203 and to remove the route from E3.
The slot is achieved by the branch train staff having to be inserted into the Annetts Key Release on the up platform at Totnes and "plunging" whilst the Exeter A Position sets the road.

Getting back on topic, there is also a firm proposal to build a new station on the Torbay branch between Torre and Newton Abbot.

Log in to reply
The following user said thank you: Temple Meads
Exeter sim - new stations..... 03/09/2014 at 21:29 #64367
benstafford
Avatar
88 posts
You could do it with a 10% gradient at each side. Be a bit messy during building though - a 2 mile diversion via either crossing, mind you the pain might be worth it.
Log in to reply