Compatibility post-EGIP. 14/01/2015 at 19:08 #67812
peterb
Avatar
452 posts
What (if anything) is being done to update this sim to ensure it is still modern and compatible with timetables in a few years time?

Arguably the biggest upgrade on the ground is electrification of the vast majority of this sim area, along with other infrastructure upgrades.

Already there are problems simulating accurately the current timetable since the Cumbernauld - Springburn line is now served by EMUs.

In some ways of course this issue also applies to Edinburgh sim, for example electrification of Polmont - Edinburgh, and the Bathgate line (which is already incompatible since it was doubled)

Log in to reply
Compatibility post-EGIP. 14/01/2015 at 20:22 #67814
Steamer
Avatar
3984 posts
Haven't Cowlairs and Edinburgh transferred to ROCs? If so, there could be conflict of interest problems.
"Don't stress/ relax/ let life roll off your backs./ Except for death and paying taxes/ everything in life.../ is only for now." (Avenue Q)
Log in to reply
Compatibility post-EGIP. 14/01/2015 at 21:18 #67815
320322
Avatar
86 posts
They have, the Bathgate re-doubling was undertaken in 2009 with reopening the following year. Bathgate was still under Edinburgh Signalling Centre up until recently. As for Cumbernauld, that was wired after the move. I believe it's still under control of Cowlairs panel in WoSSC, The Bathgate end like Queen St - Edinburgh is controlled from EoSSC now. Hope that helps
Log in to reply
Compatibility post-EGIP. 14/01/2015 at 22:20 #67820
TomOF
Avatar
452 posts
Cowlairs did not move to WSSC despite it being across the tracks.

It now forms workstation 8 & 9 at Edinburgh.

Log in to reply
Compatibility post-EGIP. 14/01/2015 at 22:46 #67821
320322
Avatar
86 posts
Tom ,please look at my post again. I was referring to the Cumbernauld line, The E&G is controlled by Edinburgh
Log in to reply
Compatibility post-EGIP. 14/01/2015 at 23:03 #67822
Peter Bennet
Avatar
5402 posts
I do intend to re-release as loader one day but there are core-code issues awaiting resolution. If it is a matter of simply adding wires I can do that easily, but resignalling requires plans, which I don't have.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
Compatibility post-EGIP. 14/01/2015 at 23:40 #67823
Ron_J
Avatar
331 posts
" said:
Tom ,please look at my post again. I was referring to the Cumbernauld line, The E&G is controlled by Edinburgh

I can confirm that the entire Cowlairs SC area of control was transferred to two new scalable IECC workstations located on the operating floor at Edinburgh IECC at 09:25 on 7th October 2013. I formally signed the workstations into use on behalf of NR Scotland Operations and made the first entry into the Occurrence Book. Also note that the workstations are styled "Cowlairs Workstation 1" and "Cowlairs Workstation 2" rather than Edinburgh 8 and 9 as stated above. For now at least the workstations are run as a seperate 'box-within-a-box' with their own stand alone link structure and LOM. The Edinburgh IECC shift manager takes nothing to do with them either. Incidentally Cowlairs fringes to Greenhill, Edinburgh, Motherwell and Yoker but not WSSC.

Last edited: 14/01/2015 at 23:46 by Ron_J
Log in to reply
Compatibility post-EGIP. 07/07/2016 at 09:36 #83445
Guts
Avatar
604 posts
Sorry to reply so late.

I had no knowledge of the electrification. This is a interesting situation, as I'm a big fan of Central Scotland sim.

Question for RON_J, would you be able to provide Peter with the signalling changes to be able to facilitate that changes that he would need to make to the Sim??

Log in to reply
Compatibility post-EGIP. 08/07/2016 at 17:30 #83481
Peter Bennet
Avatar
5402 posts
I've got most of the data and the Sim has been updated, what I'm not 100% sure of is what's happening at GLQ itself. This is being rebuilt as we speak and the only information I have is that some platforms are being lengthened into the concourse. From photos I have seen of the throat the layout looks pretty much the same so far. If anyone is in the area can confirm the layout that would be helpful.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
Compatibility post-EGIP. 08/07/2016 at 18:24 #83486
arabianights
Avatar
138 posts
" said:
I've got most of the data and the Sim has been updated, what I'm not 100% sure of is what's happening at GLQ itself. This is being rebuilt as we speak and the only information I have is that some platforms are being lengthened into the concourse. From photos I have seen of the throat the layout looks pretty much the same so far. If anyone is in the area can confirm the layout that would be helpful.

Peter
Out of interest, are you updating Edinburgh too?

Log in to reply
Compatibility post-EGIP. 08/07/2016 at 18:53 #83487
madaboutrains
Avatar
316 posts
" said:
" said:
Tom ,please look at my post again. I was referring to the Cumbernauld line, The E&G is controlled by Edinburgh

I can confirm that the entire Cowlairs SC area of control was transferred to two new scalable IECC workstations located on the operating floor at Edinburgh IECC at 09:25 on 7th October 2013. I formally signed the workstations into use on behalf of NR Scotland Operations and made the first entry into the Occurrence Book. Also note that the workstations are styled "Cowlairs Workstation 1" and "Cowlairs Workstation 2" rather than Edinburgh 8 and 9 as stated above. For now at least the workstations are run as a seperate 'box-within-a-box' with their own stand alone link structure and LOM. The Edinburgh IECC shift manager takes nothing to do with them either. Incidentally Cowlairs fringes to Greenhill, Edinburgh, Motherwell and Yoker but not WSSC.
Motherwell Closes 2017-18 so will go to WSSC. Yoker soon to on a MCS workstation. So then it will

RIP Feltham Panel 1
Log in to reply
Compatibility post-EGIP. 08/07/2016 at 20:07 #83489
Peter Bennet
Avatar
5402 posts
" said:
" said:
I've got most of the data and the Sim has been updated, what I'm not 100% sure of is what's happening at GLQ itself. This is being rebuilt as we speak and the only information I have is that some platforms are being lengthened into the concourse. From photos I have seen of the throat the layout looks pretty much the same so far. If anyone is in the area can confirm the layout that would be helpful.

Peter
Out of interest, are you updating Edinburgh too?
I intend to.

Peter

I identify as half man half biscuit - crumbs!
Log in to reply
The following user said thank you: Guts
Compatibility post-EGIP. 08/07/2016 at 22:47 #83492
arabianights
Avatar
138 posts
" said:
" said:
" said:
I've got most of the data and the Sim has been updated, what I'm not 100% sure of is what's happening at GLQ itself. This is being rebuilt as we speak and the only information I have is that some platforms are being lengthened into the concourse. From photos I have seen of the throat the layout looks pretty much the same so far. If anyone is in the area can confirm the layout that would be helpful.

Peter
Out of interest, are you updating Edinburgh too?
I intend to.

Peter
Thanks for the info, look forward to it

Log in to reply
The following user said thank you: Guts