Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

1D88/89 north wales coast express 1991

You are here: Home > Forum > Simulations > Timetables > North Wales Coast > 1D88/89 north wales coast express 1991

Page 1 of 1

1D88/89 north wales coast express 1991 07/10/2015 at 11:42 #76708
jc92
Avatar
3690 posts
Hi all.

Currently working on a north wales coast 1991 summer timetable. 1D88 is the Tuesday wednesday only crewe-llandudno-holyhead and its raising a question for me.

It stops at Llan jct for water before running to Llandudno. It then runs back and has a 10 min stop at Llan jct before running to holyhead. It doesnt have time to run round at Llandudno Jct on the return but I can't find any photographic evidencd of it topping and tailing. Can anyone confirm how it was worked?

My best guess is one of the speedlink or CE locos stabled at Llandudno Jct TC would have been attached and detatched temporarily to assist.

"We don't stop camborne wednesdays"
Log in to reply
1D88/89 north wales coast express 1991 07/10/2015 at 13:07 #76709
58050
Avatar
2659 posts
Can't see it being an RfD loco on hand at llandudno Jn. Can't recall any freight locos being diagrammed to work trains on the North Wales Coast regularly as there were some loco bashers on the loco control at Liverpool Street during the early 1990s & we used to use a certain 'AB' enquiry which would list all freight locos allocated to work class 1 & class 2 trains across the country & I don't recall seeing any freight locos allocated to work the train your on about. If it was top n tailed between Llandudno Jn & Llandudno - Llandudno Jn I suspect that it was covered by a Provincial or Regional Railways Cardiff based Cl.37/4. There's certainly nothing in the 1990, 1991 or 1992 WCML North & North Wales Trip Notices to indicate any trip loco being allocated to cover passenger work in between booked diagram work.
Log in to reply
1D88/89 north wales coast express 1991 07/10/2015 at 13:58 #76710
jc92
Avatar
3690 posts
I forgot to mention this is booked as steam hauled.
"We don't stop camborne wednesdays"
Log in to reply
1D88/89 north wales coast express 1991 07/10/2015 at 14:16 #76711
postal
Avatar
5265 posts
Online
" said:
Hi all.

Currently working on a north wales coast 1991 summer timetable. 1D88 is the Tuesday wednesday only crewe-llandudno-holyhead and its raising a question for me.

It stops at Llan jct for water before running to Llandudno. It then runs back and has a 10 min stop at Llan jct before running to holyhead. It doesnt have time to run round at Llandudno Jct on the return but I can't find any photographic evidencd of it topping and tailing. Can anyone confirm how it was worked?

My best guess is one of the speedlink or CE locos stabled at Llandudno Jct TC would have been attached and detatched temporarily to assist.
Joe

It's a long shot, but there is a pic at http://www.penmorfa.com/Archive/thirteen.htm with the caption "37504 leads 33009 into Prestatyn on the 11.18 Crewe - Holyhead on March 12th 1986. This train always ran with a refurbished loco on Wednesdays. The test loco returned light while the next booked working of the 33 took it to Cardiff." If it is the same train, did one of the locos do a RR during the first stop at LJ so that it was TnT from there on.

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Log in to reply
1D88/89 north wales coast express 1991 07/10/2015 at 14:26 #76712
postal
Avatar
5265 posts
Online
" said:
I forgot to mention this is booked as steam hauled.
Joe

There is a PDF extract on the net for a book published by Ty Mawr publications (Class 20 - Ty Mawr Publications) which includes this sentence:

" The class also took on diagrammed summer passenger workings from Derby to and from Llandudno during the early 1990’s with a fill in turn to “pull back”
the North Wales Coast Express steam working from Llandudno to Llandudno Junction included for a period."

At the foot of the page is a pic with the caption "Having just arrived on the 08.11 departure from Stoke, 20163 and 20178 wait departure from Llandudno on a North Wales Coast Express “pull back” trip to Llandudno Junction. They will eventually return to Derby at 17.14. September 10th 1991."

You will have the details in the WTT but presumably the 2 x 20s were lying over at Llandudno and dragged the steam working back to LJ before returning LE to pick up their return Llandudno - Derby working.

“In life, there is always someone out there, who won’t like you, for whatever reason, don’t let the insecurities in their lives affect yours.” – Rashida Rowe
Last edited: 07/10/2015 at 14:38 by postal
Reason: additional info

Log in to reply
The following user said thank you: jc92
1D88/89 north wales coast express 1991 07/10/2015 at 19:01 #76716
jc92
Avatar
3690 posts
Thats it John.

2D64 Derby - Llandudno arrives Llandudno 11:19. shunts its stock into the sidings and then waits for 1D88 to arrive at 12:02
1D89 departs 12:30 with the 20's on. they come off at the Junction and run back light (not timetabled) and run round their stock and work 2D90 back at 16:44 to Derby. the Kettle doesn't call at Llandudno on the way back.

Thanks!

"We don't stop camborne wednesdays"
Log in to reply