You are here: Home > Forum > Simulations > Released > Cardiff > Pontsarn AHB Failing

Page 1 of 1

Pontsarn AHB Failing 19/03/2017 at 20:48 #93868
y10g9
Avatar
895 posts
Hi Karl,
Thanks for the Cardiff sims, have enjoyed playing on Cardiff today in my spare moments.
I've just had Pontsarn AHB come up as crossing failed, presumably because the crossing has been down for an extended period of time. However the last train to pass over the crossing is several blocks further up the line (just passed UM176)and the barriers still haven't raised. Running the sim on a touch, the crossing reshowed working at the train started to pass CF101 and finally showed raised after track circuit TCC (TC between UM176 and CF101) became unoccupied.
This was the second time that I noticed that the crossing seems to be staying down for much longer than necessary with a train passing in the Up direction.

Sim V1.0.2, playing with no scenarios and St Fagans Crossing Box Disabled

Log in to reply
Pontsarn AHB Failing 19/03/2017 at 20:56 #93869
headshot119
Avatar
4869 posts
Mantis 17038

Glad you are enjoying the sims, hopefully I can get this fixed for you fairly quickly.

"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Pontsarn AHB Failing 19/03/2017 at 21:20 #93870
y10g9
Avatar
895 posts
Cheers Karl.
Screenshots and a save game for the following train going through. The barriers raised slightly earlier this time (about 20 seconds before the train passed CF101) Possibly because this time it was a Class 6 train passing rather than a Class 4.

Pontsarn 1 shows 6M78 having cleared the overlap TC which Pontsarn Crossing is on
Pontsarn 2 shows 6M78 having passed UM176
Pontsarn 3 shows Crossing Failing (message report is 05:22:05)






Post has attachments. Log in to view them.
Log in to reply
Pontsarn AHB Failing 19/03/2017 at 21:22 #93871
y10g9
Avatar
895 posts
Pontsarn 4 shows Crossing back to working (aprox 5-10 seconds after failing on this occasion)
Pontsarn 5 shows crossing back to raised (aprox 15 seconds after failing on this occasion)

Snapshot attached




Post has attachments. Log in to view them.
Log in to reply
Pontsarn AHB Failing 19/03/2017 at 21:59 #93874
headshot119
Avatar
4869 posts
I've pushed an update of Cardiff (and a few timetables) which should hopefully sort out Pontsarn AHB
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Pontsarn AHB Failing 19/03/2017 at 22:01 #93875
y10g9
Avatar
895 posts
Just watched a Train go past in the down direction over the crossing, with the barriers staying down for a very long time aswell. 1B41 had passed Signal 36 before the barried were raised.

Hope the screenshots and SSG help.


Post has attachments. Log in to view them.
Log in to reply
Pontsarn AHB Failing 02/04/2017 at 10:44 #94271
y10g9
Avatar
895 posts
headshot119 in post 93874 said:
I've pushed an update of Cardiff (and a few timetables) which should hopefully sort out Pontsarn AHB
Just run a train over Pontsarn AHB in both directions and the bug still appears to be present on V1.0.7.

Log in to reply
Pontsarn AHB Failing 02/04/2017 at 10:55 #94273
Stephen Fulcher
Avatar
2078 posts
This one is still showing as open on Mantis. I will add your observations to the ticket.