Upcoming Games

(UTC times)


Full list
Add a game

Upcoming Events

No events to display

Who's Online

Person82, jem771, zandoodle, flymo, BenWright, Cheapside, Andrew G (7 users seen recently)

Motherwell Sim - Earnock Sidings (Hamilton Sidings) AND Workstation control changes

You are here: Home > Forum > General > General questions, comments, and issues > Motherwell Sim - Earnock Sidings (Hamilton Sidings) AND Workstation control changes

Page 1 of 1

Motherwell Sim - Earnock Sidings (Hamilton Sidings) AND Workstation control changes 23/04/2017 at 15:16 #94645
Hap
Avatar
1040 posts
Afternoon all.

After a hectic session on Motherwell the other day, we were trying to turn a train at M221 to make it's back workings. Unfortunately the driver informed me that it was he didn't have the right traction for the move. This led me to wonder why not as I was sure that the X/O is indeed wired.

So I consulted my route maps and A couple of drivers that drive round the route and I can confirm that it is indeed wired and can be used as a turning point. Also from M218 back towards Hamilton and ALSO The sidings are wired and available for use but only from the buffer end to M216 and onto the mianline. I've included a route map and a shot of the signals involved from the sim.

Finally, there has been an upgrade to the workstation control, and what was Panel 1 is now under control of Newton Workstation at the West of Scotland SC.




Post has attachments. Log in to view them.
How to report an issue: www.SimSig.co.uk/Wiki/Show?page=usertrack:reportanissue
Last edited: 23/04/2017 at 15:55 by headshot119
Reason: Deleted by moderator

Log in to reply