Page 1 of 1
Oxford South LC 19/07/2017 at 17:55 #96499 | |
Banners88
112 posts |
Scrap this! Just takes 3 minutes to close the crossing... Having an issue getting Oxford South LC to work. 2016 TT starting at 00:00. Trying to route the first two trains through but having trouble getting the LC crossing down. The icon automatically moves to closed but then just continues to flash without going steady and suggesting the crossing is closed. Visa versa I can't open the crossing even with no routes set across it, the closed icon just continues to flash. I can't see any mention of anything I'm doing wrong in the Wiki entry. Last edited: 19/07/2017 at 17:57 by Banners88 Reason: Problem sorted. Log in to reply |
Oxford South LC 19/07/2017 at 18:02 #96500 | |
MarkC
1105 posts |
Banners88 in post 96499 said:Scrap this! Just takes 3 minutes to close the crossing...This was discussed in this thread. The crossing is a manual crossing that on sim start, the crossing starts its closing process, it does take quite a long time for it to open and close, one quote I've seen on time taken is 5-8 mins. Log in to reply |
Oxford South LC 20/07/2017 at 14:50 #96511 | |
GB
64 posts |
Begs the question should the level crossing not be removed from the modern layouts?
Log in to reply |
Oxford South LC 20/07/2017 at 19:27 #96514 | |
Stephen Fulcher
2078 posts |
No because it is still there and classed as in use, just never used.
Log in to reply |
Oxford South LC 21/07/2017 at 13:35 #96527 | |
wellgroomed
110 posts |
Stephen Fulcher in post 96514 said:No because it is still there and classed as in use, just never used.As long as there aren't any calls coming through! Log in to reply |