Signalling problems at Dronfield.

You are here: Home > Forum > Simulations > Released > Trent > Signalling problems at Dronfield.

Page 1 of 1

Signalling problems at Dronfield. 30/12/2009 at 18:00 #460
officer dibble
Avatar
409 posts
Hi everyone

Currently involved in an online game and have got myself at signal failure on the Clay Cross panel at Dronfield in the direction of Sheffield. Currently I have 3 trains in a queue at Dronfield, they being 1E44/1F40/1S47.

I have recieved no phone calls from any of these trains, I assume as a result of the signal failure being in the control area of Sheffield PSB?

I suppose I have to wait until the signal gets repaired as per normal, even though its off my patch?

When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Unable to operate a HEx service 4 vice 8 - 2A. Points failure at Ipswich - 2A. Landslip at Pitlochry - 2A
Log in to reply
Signalling problems at Dronfield. 30/12/2009 at 18:00 #5427
officer dibble
Avatar
409 posts
Hi everyone

Currently involved in an online game and have got myself at signal failure on the Clay Cross panel at Dronfield in the direction of Sheffield. Currently I have 3 trains in a queue at Dronfield, they being 1E44/1F40/1S47.

I have recieved no phone calls from any of these trains, I assume as a result of the signal failure being in the control area of Sheffield PSB?

I suppose I have to wait until the signal gets repaired as per normal, even though its off my patch?

When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Unable to operate a HEx service 4 vice 8 - 2A. Points failure at Ipswich - 2A. Landslip at Pitlochry - 2A
Log in to reply
Signalling problems at Dronfield. 31/12/2009 at 21:01 #5464
officer dibble
Avatar
409 posts
My apologies, I do not, it took approx 60 mins to clear itself.

From what I remember it was the signal before the platform that Dronfield that was causing problems (towards Sheffield).

When in doubt - Contingency plan 2A. Someone didn't buy the milk - 2A. Someone sneezed at Swansea - 2A. A driver complains the cab is too cold - 2A. Unable to operate a HEx service 4 vice 8 - 2A. Points failure at Ipswich - 2A. Landslip at Pitlochry - 2A
Log in to reply
Signalling problems at Dronfield. 06/01/2010 at 11:08 #5551
UKTrainMan
Avatar
1803 posts
I suspect it'll be one of these signals;

S27, S31, S33, S35, S37, S39, S41, S43, S45 or S47

which are all in the area beyond the points at Tapton Junction.

Correct me if I am wrong here but if you're the host ("Server"surely you could just use the Train List (F2) to authorise each train to SPAD the failed signal? If you're only a player ("Client"then use the Control Panel (Go to the multiplayer menu and click on 'Control Panel'to SPAD the trains ... although with either method you'll have to do it once for each train until the problem is fixed.

Any views and / or opinions expressed by myself are from me personally and do not represent those of any company I either work for or am a consultant for.
Log in to reply
Signalling problems at Dronfield. 14/01/2010 at 11:28 #5853
KurtDS
Avatar
49 posts
Signals "off" patch shouldn't fail, therefore it it fairly important you try and remember which signal it was, or make a note in the future, as this suggests a problem I need to look at.
Log in to reply