Track arrangements incorrect Piccadilly P9-P11 in 1990 mode 06/01/2018 at 20:03 #104863
whatlep
Avatar
377 posts
There are discrepancies in the P9-P11 diagram for 1990 mode, with P9 having direct access to the Down Slow and P10-P13 missing an extra route. Opening day October 1988 layout shown in the attached screenshot taken from the "Yellow Peril".
Post has attachments. Log in to view them.
Log in to reply
Track arrangements incorrect Piccadilly P9-P11 in 1990 mode 06/01/2018 at 20:43 #104864
headshot119
Avatar
4869 posts
From the manual "The earliest era is a compromise as part of MPSCC didn’t exist in that timeframe, but allows timetables for that era to be run with very minor compromises."
"Passengers for New Lane, should be seated in the rear coach of the train " - Opinions are my own and not those of my employer
Log in to reply
Track arrangements incorrect Piccadilly P9-P11 in 1990 mode 07/01/2018 at 01:26 #104866
whatlep
Avatar
377 posts
headshot119 in post 104864 said:
From the manual "The earliest era is a compromise as part of MPSCC didn’t exist in that timeframe, but allows timetables for that era to be run with very minor compromises."
Yes, I had read that, but I am talking about the MPSCC area that existed since operational Day 1 in 1988, not the extensions to take in Windsor Bridge and Bolton in 1989 and 1990 which that quotation refers to.

Log in to reply
Track arrangements incorrect Piccadilly P9-P11 in 1990 mode 07/01/2018 at 02:54 #104867
kaiwhara
Avatar
587 posts
whatlep in post 104866 said:
headshot119 in post 104864 said:
From the manual "The earliest era is a compromise as part of MPSCC didn’t exist in that timeframe, but allows timetables for that era to be run with very minor compromises."
Yes, I had read that, but I am talking about the MPSCC area that existed since operational Day 1 in 1988, not the extensions to take in Windsor Bridge and Bolton in 1989 and 1990 which that quotation refers to.
I think you are missing the point. The changes for the 1990's era specifically relates to an earlier thread to get one of the fringes working for a timetable for that era. These alterations did not change anything at Piccadilly, nor were they intended to given that the 90's era was solely intended as a compromise. The era in question never intended to replicate all signalling arrangements for that area across the entire sim, and this was stated clearly at the time.

This does not fundamentally change the functionality of Piccadilly Station.

Sorry guys, I am in the business of making people wait!
Log in to reply
Track arrangements incorrect Piccadilly P9-P11 in 1990 mode 07/01/2018 at 08:49 #104868
GeoffM
Avatar
6376 posts
Hmm, I could see how my wording could be interpreted but it does refer to the entire layout.
SimSig Boss
Log in to reply
The following user said thank you: whatlep
Track arrangements incorrect Piccadilly P9-P11 in 1990 mode 12/02/2018 at 15:09 #105850
whatlep
Avatar
377 posts
kaiwhara in post 104867 said:
whatlep in post 104866 said:
[quote=headshot119;post=104864]From the manual "The earliest era is a compromise as part of MPSCC didn’t exist in that timeframe, but allows timetables for that era to be run with very minor compromises."
These alterations did not change anything at Piccadilly, nor were they intended to given that the 90's era was solely intended as a compromise. The era in question never intended to replicate all signalling arrangements for that area across the entire sim, and this was stated clearly at the time.

This does not fundamentally change the functionality of Piccadilly Station.
I've spent quite a lot of time proving that last sentence incorrect by coding timetables for the 1990 era. At that time, platforms 10/11 were used as slow line platforms for terminating/ starting services at the same time as platform 9 was used for lengthy WCML trains (290 metres or so). Platforms 10/11 could be used as timetabled ONLY by reliance on the missing connection to/from the slow lines, since any long train in platform 9 blocked access.

While I appreciate the extra work put in to create the Altrincham line, the old layout around platforms 9-11 at Piccadilly really is required for a correct 1990s era simulation.

Log in to reply
The following user said thank you: Muzer